Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Laramie County Community College (LCCC) is soliciting bids to replace the domestic water heaters in the Foundation and East residence halls, removing existing units and installing new units of equal capacity. The scope excludes existing pumps and controllers but requires adding a new Building Automation System (BAS) signal for hot water temperature monitoring at East Hall and a new BAS node at Foundation. The IFB (ID IFB #207060) seeks proposals complying with the solicitation instructions and timelines published on the college’s procurement portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Prequalification for general contractors to perform roof replacement construction at McMahon Residence Hall (University of Connecticut). Requires submission of a Statement of Qualifications and prequalification documents (DAS prequalification certificate, financial ability, CT authorization, QA and Health & Safety plans, resumes/experience forms).
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Prequalification for general contractors to perform roof replacement construction at McMahon Residence Hall (University of Connecticut). Requires submission of a Statement of Qualifications and prequalification documents (DAS prequalification certificate, financial ability, CT authorization, QA and Health & Safety plans, resumes/experience forms).
AvailableRFQ seeking a prequalified General Contractor to perform roof replacement at UConn McMahon Residence Hall (Storrs, CT). Requires Connecticut DAS prequalification in Roofing, demonstrated financial/bonding capacity ≥ $1,400,000, experience with comparable roofing projects (recommended project value ≈ $1,000,000), ability to self-perform ≥10% of the contract, compliance with FM Global and 2021 IECC/IBC roof assembly standards, and set-aside participation (≥30% SBE, ≥10% MBE).
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
RFQ seeking a prequalified General Contractor to perform roof replacement at UConn McMahon Residence Hall (Storrs, CT). Requires Connecticut DAS prequalification in Roofing, demonstrated financial/bonding capacity ≥ $1,400,000, experience with comparable roofing projects (recommended project value ≈ $1,000,000), ability to self-perform ≥10% of the contract, compliance with FM Global and 2021 IECC/IBC roof assembly standards, and set-aside participation (≥30% SBE, ≥10% MBE).
Dickinson State University (DSU) is soliciting proposals to supply and install residence hall furniture for the Woods Hall renovation, including bedroom and lounge furnishings meeting ADA and STURDY Act requirements. The procurement covers 126 beds across multiple room types and will be evaluated primarily on technical merit (80 points) and cost (20 points); proposals are due December 22, 2025.
Posted Date
Dec 2, 2025
Due Date
Dec 22, 2025
Release: Dec 2, 2025
Close: Dec 22, 2025
Dickinson State University (DSU) is soliciting proposals to supply and install residence hall furniture for the Woods Hall renovation, including bedroom and lounge furnishings meeting ADA and STURDY Act requirements. The procurement covers 126 beds across multiple room types and will be evaluated primarily on technical merit (80 points) and cost (20 points); proposals are due December 22, 2025.
Removal of the existing roof assembly on the north and south towers along with the loading canopy roof at the south tower. Existing roof assembly to be removed down to the base layer underlayment, including all parapet caps and flashing at the perimeter and roof penetrations. Install a new roofing assembly complying with FM global standards, 2021 international energy conservation code and the 2021 international building code roof assembly, rooftop structure, and fire classification.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Removal of the existing roof assembly on the north and south towers along with the loading canopy roof at the south tower. Existing roof assembly to be removed down to the base layer underlayment, including all parapet caps and flashing at the perimeter and roof penetrations. Install a new roofing assembly complying with FM global standards, 2021 international energy conservation code and the 2021 international building code roof assembly, rooftop structure, and fire classification.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis