Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Nantucket
Removal and installation of two Overhead Doors, Series "591" 20'-2" x 16'-1", Thermacore Commercial. Include heavy-duty torsion springs, new tracks, and hardware. All in white finish.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Palm Beach County
Work include overhead door replacement.
Posted Date
Apr 22, 2023
Due Date
Jan 9, 2028
Release: Apr 22, 2023
Palm Beach County
Close: Jan 9, 2028
Work include overhead door replacement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Copake
Replacement of weather stripping on six overhead doors for the Highway Garage. Doors are 14’2” X 14’0” Tricore 3” thick steel doors. Replace (6) bottom retainers with bottom rubber; Replace composite stop on side jambs - needs to be screwed on to steel; Remove & dispose of doorstop and bottom rubber.
Posted Date
Nov 10, 2025
Due Date
Dec 1, 2025
Release: Nov 10, 2025
Town of Copake
Close: Dec 1, 2025
Replacement of weather stripping on six overhead doors for the Highway Garage. Doors are 14’2” X 14’0” Tricore 3” thick steel doors. Replace (6) bottom retainers with bottom rubber; Replace composite stop on side jambs - needs to be screwed on to steel; Remove & dispose of doorstop and bottom rubber.
AvailableTown of Nantucket
Scope of Work encompasses the removal and disposal of existing carpet in the TSA Passenger Hold Room and Checkpoint areas. Install commercial-grade carpet tiles suitable for a high-traffic environment.
Posted Date
Nov 24, 2025
Due Date
Dec 17, 2025
Release: Nov 24, 2025
Town of Nantucket
Close: Dec 17, 2025
Scope of Work encompasses the removal and disposal of existing carpet in the TSA Passenger Hold Room and Checkpoint areas. Install commercial-grade carpet tiles suitable for a high-traffic environment.
AvailableBase Alameda (00031)
The contractor remove and properly dispose of two (2) existing overhead doors and replace them with a single door at a U.S. Coast Guard facility.
Posted Date
Nov 21, 2025
Due Date
Nov 28, 2025
Release: Nov 21, 2025
Base Alameda (00031)
Close: Nov 28, 2025
The contractor remove and properly dispose of two (2) existing overhead doors and replace them with a single door at a U.S. Coast Guard facility.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →