Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Maryland Motor Vehicle Administration
The Maryland Department of Transportation Motor Vehicle Administration (MDOT MVA) seeks bids to replace computer room air conditioning (CRAC) units and associated chilled‑water systems serving the Office of Information Center at MVA Headquarters in Glen Burnie, Maryland. The scope includes removal and replacement of ten CRAC units, chillers, a cooling tower, and related mechanical/electrical/control systems, with phased work to minimize disruption.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Maryland Motor Vehicle Administration
The Maryland Department of Transportation Motor Vehicle Administration (MDOT MVA) is soliciting bids to replace computer room air conditioning (CRAC) units and associated chilled water systems at the MVA Headquarters data center in Glen Burnie, Maryland. Work includes replacing ten CRAC units and related mechanical/electrical/control systems and will be phased to minimize operational disruptions, with an estimated performance period of 270 days.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
Maryland Motor Vehicle Administration
Close: Dec 5, 2025
The Maryland Department of Transportation Motor Vehicle Administration (MDOT MVA) is soliciting bids to replace computer room air conditioning (CRAC) units and associated chilled water systems at the MVA Headquarters data center in Glen Burnie, Maryland. Work includes replacing ten CRAC units and related mechanical/electrical/control systems and will be phased to minimize operational disruptions, with an estimated performance period of 270 days.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Air Force Test Center
Requires the replacement and upgrade of two existing Direct Expansion (DX) Computer Room Air Conditioning (CRAC) unit systems, including condensing units, located at Bldg. 1020 Rm. 400.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Air Force Test Center
Close: Dec 16, 2025
Requires the replacement and upgrade of two existing Direct Expansion (DX) Computer Room Air Conditioning (CRAC) unit systems, including condensing units, located at Bldg. 1020 Rm. 400.
AvailableChristopher Newport University
Replacement of four computer room air conditioners (crac) and modular glycol chiller that condition the ups room and data center at hall. The new crac units will be connected to the cnu chilled water plant loop and the modular chiller will be replaced to serve as a backup source of chilled water for these units. The project also includes the demolition of a packaged direct-expansion air handler located outdoors beside the data center.
Posted Date
-
Due Date
Dec 3, 2025
Christopher Newport University
Close: Dec 3, 2025
Replacement of four computer room air conditioners (crac) and modular glycol chiller that condition the ups room and data center at hall. The new crac units will be connected to the cnu chilled water plant loop and the modular chiller will be replaced to serve as a backup source of chilled water for these units. The project also includes the demolition of a packaged direct-expansion air handler located outdoors beside the data center.
AvailableChristopher Newport University
Replacement of four computer room air conditioners (crac) and modular glycol chiller that condition the ups room and data center at hall. The new crac units will be connected to the cnu chilled water plant loop and the modular chiller will be replaced to serve as a backup source of chilled water for these units. The project also includes the demolition of a packaged direct-expansion air handler located outdoors beside the data center.
Posted Date
-
Due Date
Dec 3, 2025
Christopher Newport University
Close: Dec 3, 2025
Replacement of four computer room air conditioners (crac) and modular glycol chiller that condition the ups room and data center at hall. The new crac units will be connected to the cnu chilled water plant loop and the modular chiller will be replaced to serve as a backup source of chilled water for these units. The project also includes the demolition of a packaged direct-expansion air handler located outdoors beside the data center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →