Retrieving RFP details
Release
Close
Montgomery County
The work will consist of the following: a.Relocate the existing water and sewer utilities below Mill Creek per the WSSC plans. b.Install 12” casing pipe below Mill Creek per the Washington Gas plans. c. Removal of the existing 27’-8” +/- wide concrete bridge. d. Install a new, 48’-0” wide bridge comprised of precast non voided, concrete slabs, abutments, and wing walls. e. Mill and resurface 215 LF of the existing roadway. f. Full depth pavement reconstruction for 50 LF (g) 363 LF of W-beam traffic barrier with anchorage to the proposed bridge structure and three (3) Type C end treatments. (h) 112 LF of Type A combination curb and gutter. (i) One (1) Type E combination inlet. (j) Installation of 15.9 LF 15” RCP storm drain pipe. (k) Stream restoration along approximately 375 LF of Mill Creek as shown on theplans.(l) Tree planting as shown on the plans. (m) Installation of pavement markings and signs.
Pennsylvania Department of Transportation
Furnishing and installation of a One-Span Composite Pre-stressed Concrete Adjacent Box Beam Superstructure over a tributary to Corey Creek with an overall length of 64.50 linear feet (0.065 miles), selective tree removal and other miscellaneous construction.
Holmes County
Work includes bridge replacement.
Hamilton County
Replacement plans for bridge #125 atlantic rd over stony creek.
Release
Sep 18, 2025
Close
Oct 31, 2025