Retrieving RFP details
Release
Close
Hingham Public Schools
Removal and replacement of two (2) HVAC AHU units located in the interior of the building and two (2) ACCU units are located are on the roof. All replacement equipment will be placed where the existing equipment is currently located. Work will include removal and replacement of equipment along with all associated mechanical, electrical, carpentry, insulation, building management/sensors, ductwork, fire protection, water proofing, damproofing and wiring.
261P - NETWORK CONTRACT OFC21 (00261P)
Perform air filter replacement of HVAC Air Handling Units (AHU) on 96 Air Handling Units.
Arkansas Division of Building Authority
Replacement of the two (2) air handling units. Work includes review of the agency's program and budget for this project; code analysis to ensure the project complies with all applicable federal and state codes as well as state rules and standards; review of the proposed site for compliance with federal and state regulations and rules regarding floodplain development management; development of an estimate of the maximum probable cost of the project; development of a schematic design submittal (approximately 25% complete documents) and an estimate of the annual utility consumption and operating cost for review and approval by the agency. See attached file.
Illinois Capital Development Board
Work includes to replace air handling units.
Release
Oct 24, 2025
Close
Nov 21, 2025