Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
MWR Midwest Region (60000)
Replace roof visitor center & administration bldg. Remove approximately 10538 Square Feet of western red cedar shingles. Inspect and replace an estimated 15% of the 10538 SF of skip sheeting. Matching dimensional size and wood species. Install approximately 10538 SF of fire retardant western red cedar wood shingles, hand nailing the shingle installation. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
W7NR USPFO Activity Nyang 106
Provide bldg 250 roof repair.
Posted Date
Oct 2, 2025
Due Date
Dec 3, 2025
Release: Oct 2, 2025
W7NR USPFO Activity Nyang 106
Close: Dec 3, 2025
Provide bldg 250 roof repair.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
National Park Service
Rehab visitor center restrooms.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
National Park Service
Close: Dec 18, 2025
Rehab visitor center restrooms.
AvailableKentucky Transportation Cabinet
Work includes : remove identified areas of moisture in the existing roof system & replace with like materials. Remove all existing shingle roofing down to the wood roof deck. Provide 2-ply modified bitumen roofing membrane on a cover board over the existing roof system on all low-slope roof areas. Provide new flashings and pre-finished metal where required. Install new underlayment, ice/water shield and asphalt shingles. Alternates are for new flag support structure and anchors and metal roof system.
Posted Date
Oct 21, 2025
Due Date
Dec 4, 2025
Release: Oct 21, 2025
Kentucky Transportation Cabinet
Close: Dec 4, 2025
Work includes : remove identified areas of moisture in the existing roof system & replace with like materials. Remove all existing shingle roofing down to the wood roof deck. Provide 2-ply modified bitumen roofing membrane on a cover board over the existing roof system on all low-slope roof areas. Provide new flashings and pre-finished metal where required. Install new underlayment, ice/water shield and asphalt shingles. Alternates are for new flag support structure and anchors and metal roof system.
AvailableHall County
Replace the patio deck roof at the County Government Center. Installing thermoplastic polyolefin (TPO) membrane roofing. Furnish and install grey 60 mil TPO membrane roof, fully adhered. Install new (Medium Bronze) metal coping on all required areas such as perimeter walls, building, etc.
Posted Date
Nov 5, 2025
Due Date
Dec 11, 2025
Release: Nov 5, 2025
Hall County
Close: Dec 11, 2025
Replace the patio deck roof at the County Government Center. Installing thermoplastic polyolefin (TPO) membrane roofing. Furnish and install grey 60 mil TPO membrane roof, fully adhered. Install new (Medium Bronze) metal coping on all required areas such as perimeter walls, building, etc.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →