Cornell University
The project includes the replacement of roof area 1164-001 and an alternate for roof area 1164-008. The existing ballasted roof system will be demolished and replaced with a KEE PVC roof assembly on existing concrete and/or metal decks. Work also includes skylight replacement, roof ladder, guard rails, lightning protection, lighting, and the modification of various rooftop mechanical supports, curbs, and equipment to accommodate the new roofing system. Gravel must be removed using hand carts to reduce noise and disturbance in the building during construction.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cornell University
Replacement of roofing systems and skylights at the veterinary medical center. The project will be phased over multiple construction seasons and includes the replacement of two (2) roof areas. The existing ballasted roof system will be demolished and replaced with a kee pvc roof assembly on existing concrete and/or metal decks. Work also includes skylight replacement, roof ladder, guard rails, lightning protection, lighting, and the modification of various rooftop mechanical supports, curbs, and equipment to accommodate the new roofing system.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
Cornell University
Close: Dec 11, 2025
Replacement of roofing systems and skylights at the veterinary medical center. The project will be phased over multiple construction seasons and includes the replacement of two (2) roof areas. The existing ballasted roof system will be demolished and replaced with a kee pvc roof assembly on existing concrete and/or metal decks. Work also includes skylight replacement, roof ladder, guard rails, lightning protection, lighting, and the modification of various rooftop mechanical supports, curbs, and equipment to accommodate the new roofing system.
AvailableSouth Dakota Department of Corrections
Replace roof top units, phase 3.
Posted Date
-
Due Date
Nov 20, 2025
Release: -
South Dakota Department of Corrections
Close: Nov 20, 2025
Replace roof top units, phase 3.
AvailableJohnston Community School District
Base bid consists of re-roofing all existing and fully adhered and ballasted EPDM roofs to remove existing 2" thick river rock ballast and loose-laid EPDM roof membrane, any wet insulation and all perimeter membrane flashing, metal roof edge and counter flashings and install 2" thick rigid polyisocryanurate roof insulation screw fastened. See outside link.
Posted Date
Oct 22, 2025
Due Date
Nov 18, 2025
Release: Oct 22, 2025
Johnston Community School District
Close: Nov 18, 2025
Base bid consists of re-roofing all existing and fully adhered and ballasted EPDM roofs to remove existing 2" thick river rock ballast and loose-laid EPDM roof membrane, any wet insulation and all perimeter membrane flashing, metal roof edge and counter flashings and install 2" thick rigid polyisocryanurate roof insulation screw fastened. See outside link.
Kentucky Transportation Cabinet
Work includes : remove identified areas of moisture in the existing roof system & replace with like materials. Remove all existing shingle roofing down to the wood roof deck. Provide 2-ply modified bitumen roofing membrane on a cover board over the existing roof system on all low-slope roof areas. Provide new flashings and pre-finished metal where required. Install new underlayment, ice/water shield and asphalt shingles. Alternates are for new flag support structure and anchors and metal roof system.
Posted Date
Oct 21, 2025
Due Date
Dec 4, 2025
Release: Oct 21, 2025
Kentucky Transportation Cabinet
Close: Dec 4, 2025
Work includes : remove identified areas of moisture in the existing roof system & replace with like materials. Remove all existing shingle roofing down to the wood roof deck. Provide 2-ply modified bitumen roofing membrane on a cover board over the existing roof system on all low-slope roof areas. Provide new flashings and pre-finished metal where required. Install new underlayment, ice/water shield and asphalt shingles. Alternates are for new flag support structure and anchors and metal roof system.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis