Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace condensate lines and pumps construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
To replace two existing pedestal-style steam condensate pumps (pump p-1 and pump p-2) with new, specified pump models, ensuring the reliable and efficient return of steam condensate to the boiler system. This includes all necessary mechanical, electrical, and piping modifications. Pre-Installation and Safety: Safety Plan: Develop and submit a site-specific safety plan (including Lockout/Tagout procedures). System Shutdown: Coordinate and execute the safe shutdown, isolation, and draining of the condensate return system and associate steam/utility lines for the existing pumps. Containment: Provide necessary containment and temporary bypass for condensate overflow, if required, to ensure continuous facility operation where possible. See attached file.
Posted Date
Dec 9, 2025
Due Date
Dec 23, 2025
Premium
Access the largest public sector contact database
Close: Dec 23, 2025
To replace two existing pedestal-style steam condensate pumps (pump p-1 and pump p-2) with new, specified pump models, ensuring the reliable and efficient return of steam condensate to the boiler system. This includes all necessary mechanical, electrical, and piping modifications. Pre-Installation and Safety: Safety Plan: Develop and submit a site-specific safety plan (including Lockout/Tagout procedures). System Shutdown: Coordinate and execute the safe shutdown, isolation, and draining of the condensate return system and associate steam/utility lines for the existing pumps. Containment: Provide necessary containment and temporary bypass for condensate overflow, if required, to ensure continuous facility operation where possible. See attached file.
AvailableIn general, the work consists of: Replace five existing low pressure steam condensate pumps and receivers with new duplex condensate pumps at four campus buildings: Applied Arts, Fryland Hall, Jarvis Hall - Science Wing, and Louis Smith Tainter House. Provide new electrical and housekeeping pads as required.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
Close: Dec 18, 2025
In general, the work consists of: Replace five existing low pressure steam condensate pumps and receivers with new duplex condensate pumps at four campus buildings: Applied Arts, Fryland Hall, Jarvis Hall - Science Wing, and Louis Smith Tainter House. Provide new electrical and housekeeping pads as required.
AvailableWork includes remove and replace two (2) raypak heat units and 2 circulator pumps.
Posted Date
Dec 3, 2025
Due Date
Dec 17, 2025
Release: Dec 3, 2025
Close: Dec 17, 2025
Work includes remove and replace two (2) raypak heat units and 2 circulator pumps.
The rehabilitation of water lines. The project will replace main domestic water distribution lines, structurally reenforce the main booster pump house, and construct security gate for the booster pump house, as such extra attentions will be for phasing and coordinating water shutdowns to minimize impacts to normal hospital operations.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
The rehabilitation of water lines. The project will replace main domestic water distribution lines, structurally reenforce the main booster pump house, and construct security gate for the booster pump house, as such extra attentions will be for phasing and coordinating water shutdowns to minimize impacts to normal hospital operations.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.