Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Portland
All demolition and site preparation work as indicated on the plans; earthwork, including preparation of new playground areas, new stone dust area, and minor grading associated with the playground improvements; stormwater improvements, including underdrain systems, storm drainpipe, and basin connections; placing reclaimed granite curbing and features (provided by city on-site) as indicated on the plans; relocating and setting existing landscape boulders on site; providing, constructing / installing timber and log edging, stepping logs, boardwalk, and wood bench features; constructing asphalt, stone dust, and sand areas / paths. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cajon Valley Union School District
Work consists of playground replacement project at elementary school. Work includes, remove and haul away existing cushioning materials. Excavate area to minimum depth of 16"; provide & install 4" depth 3/4" drainage rock, drainfelt and minimum depth of 12" cushioning chips; remove and haul away existing playground equipment; remove and haul away existing asphalt and concrete border to allow for new expansion of existing project; install new compliant ramp as needed to meet all ADA requirements.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
Cajon Valley Union School District
Close: Dec 9, 2025
Work consists of playground replacement project at elementary school. Work includes, remove and haul away existing cushioning materials. Excavate area to minimum depth of 16"; provide & install 4" depth 3/4" drainage rock, drainfelt and minimum depth of 12" cushioning chips; remove and haul away existing playground equipment; remove and haul away existing asphalt and concrete border to allow for new expansion of existing project; install new compliant ramp as needed to meet all ADA requirements.
AvailableCalhoun County School District
Furnish and install new playground equipment, surfacing, and containment border.
Posted Date
Oct 27, 2025
Due Date
Nov 21, 2025
Release: Oct 27, 2025
Calhoun County School District
Close: Nov 21, 2025
Furnish and install new playground equipment, surfacing, and containment border.
Benton Area School District
Work include demolition, site preparation, drainage improvements, and furnishing and installation of new playground equipment, surfacing, fencing, accessible routes, and related site amenities.
Posted Date
Oct 17, 2025
Due Date
Nov 24, 2025
Release: Oct 17, 2025
Benton Area School District
Close: Nov 24, 2025
Work include demolition, site preparation, drainage improvements, and furnishing and installation of new playground equipment, surfacing, fencing, accessible routes, and related site amenities.
AvailablePlymouth-Canton Community Schools
Work includes elementary school playground upgrades.
Posted Date
Nov 10, 2025
Due Date
Nov 24, 2025
Release: Nov 10, 2025
Plymouth-Canton Community Schools
Close: Nov 24, 2025
Work includes elementary school playground upgrades.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis