Retrieving RFP details
Release
Close
Truckee Meadows Water Authority
Rehabilitation of two underground booster pump stations. Work includes electrical work and pipe work both inside and outside the vault. In addition to the work at hoge 2 bps, an insertion valve is to be installed on a 14" transite main.
Town of Ridgeway
Refurbish 5 wastewater pumping stations. 4 of the 5 existing pumping stations are above-ground; work will consist of the installation of a bypass connection, new air vents, replacement of all pump station equipment, refurbishment of the wetwells, grading, and electrical work. The 5th pump station consists of removal & replacement of the existing submersible pumps.
City of Weeping Water
Construction of installation of a new 8" PVC water main along F street and rehabilitation of the booster pump house at the water tank site with new pumps and piping.
Erie City Water Authority
Provide general/mechanical and electrical construction for the improvements to the booster pump station.
Release
Oct 29, 2025
Close
Nov 20, 2025