Retrieving RFP details
Release
Close
Town of Ridgeway
Refurbish 5 wastewater pumping stations. 4 of the 5 existing pumping stations are above-ground; work will consist of the installation of a bypass connection, new air vents, replacement of all pump station equipment, refurbishment of the wetwells, grading, and electrical work. The 5th pump station consists of removal & replacement of the existing submersible pumps.
Invite for Bid & Registration Form - Ridgeway
Truckee Meadows Water Authority
Rehabilitation of two underground booster pump stations. Work includes electrical work and pipe work both inside and outside the vault. In addition to the work at hoge 2 bps, an insertion valve is to be installed on a 14" transite main.
Massachusetts Water Resources Authority, Deer Island
Work includes demolition and replacement of the roofs at three critical water pump stations.
Cannon County
Rehabilitation of one home.
Release
Oct 15, 2025
Close
Nov 14, 2025