Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
NYC Transit Bid Desk
Contract includes the complete reconfiguration and renovation of NYPD Transit District Office # 4 (“NYPD Transit Facility”) The scope of the Work is generally summarized as follows: Demolition of the existing NYPD Transit Facility. Reconstruction of the NYPD Transit Facility including replacement of all architectural, mechanical, structural, utility, communications and electrical components. Construction of a ventilation structure (a new surface walkway grate) in Union Square Park for the NYPD Transit Facility. Installation of new water service for the connection for the NYPD Transit Facility.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Aberdeen
The City of Aberdeen seeks an architectural and engineering firm to provide design services for the Aberdeen Transit Oriented (TOD) Station Square Project, including drawings, specifications, cost estimates, and preliminary design with environmental and geotechnical studies. A mandatory pre-proposal conference is required, written questions are due by October 27, 2025, and proposals are due by December 1, 2025 at 4:00 PM EST.
Posted Date
Sep 22, 2025
Due Date
Dec 1, 2025
Release: Sep 22, 2025
City of Aberdeen
Close: Dec 1, 2025
The City of Aberdeen seeks an architectural and engineering firm to provide design services for the Aberdeen Transit Oriented (TOD) Station Square Project, including drawings, specifications, cost estimates, and preliminary design with environmental and geotechnical studies. A mandatory pre-proposal conference is required, written questions are due by October 27, 2025, and proposals are due by December 1, 2025 at 4:00 PM EST.
AvailableCity of Golconda
Replacement of the existing pump station with a new duplex submersible pump lift station, pre-cast concrete wet well, valve vault, & manholes, electrical controls and service, 8" and 10" PVC sanitary sewer connections to the new lift station and 6" PVC force main piping, connections and other appurtenant work. Cleaning & video inspection of approx. 470 LF of 8" and 880 LF of 10" sanitary sewer, sewer rehabilitation that may include 8" & 10" CIPP, lateral reinstatement, point repairs, manhole lining, and other appurtenant work.
Posted Date
-
Due Date
Dec 9, 2025
City of Golconda
Close: Dec 9, 2025
Replacement of the existing pump station with a new duplex submersible pump lift station, pre-cast concrete wet well, valve vault, & manholes, electrical controls and service, 8" and 10" PVC sanitary sewer connections to the new lift station and 6" PVC force main piping, connections and other appurtenant work. Cleaning & video inspection of approx. 470 LF of 8" and 880 LF of 10" sanitary sewer, sewer rehabilitation that may include 8" & 10" CIPP, lateral reinstatement, point repairs, manhole lining, and other appurtenant work.
AvailableBridgeland Development, LP
The rehabilitation of irrigation pump station (IPS) no. 1, 2, and 4 including but not limited to abrasive blasting and recoating all above ground piping, valves, and fittings, at IPS no. 1, 2, and 4, furnish and install (5) five 6-inch hydrocyclone sand filters by netafim including all piping modifications as shown on the plans at IPS no. 4, and electrical system upgrades.
Posted Date
Oct 30, 2025
Due Date
Nov 20, 2025
Release: Oct 30, 2025
Bridgeland Development, LP
Close: Nov 20, 2025
The rehabilitation of irrigation pump station (IPS) no. 1, 2, and 4 including but not limited to abrasive blasting and recoating all above ground piping, valves, and fittings, at IPS no. 1, 2, and 4, furnish and install (5) five 6-inch hydrocyclone sand filters by netafim including all piping modifications as shown on the plans at IPS no. 4, and electrical system upgrades.
AvailableCity of Cambridge
Work consists of the construction of a new precast, post-tensioned wet well on an existing pumping station site, inclusive of pumps, mechanical piping, yard piping, vault structures, modifications to existing structures on site, renovations to an existing influent screen structure, a new wet well canopy structure, traveling bridge crane, odor control system, and all other appurtenant electrical, site, and appurtenant improvements.
Posted Date
Nov 7, 2025
Due Date
Dec 12, 2025
Release: Nov 7, 2025
City of Cambridge
Close: Dec 12, 2025
Work consists of the construction of a new precast, post-tensioned wet well on an existing pumping station site, inclusive of pumps, mechanical piping, yard piping, vault structures, modifications to existing structures on site, renovations to an existing influent screen structure, a new wet well canopy structure, traveling bridge crane, odor control system, and all other appurtenant electrical, site, and appurtenant improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis