Retrieving RFP details
Release
Close
City of Weldon Spring
Installation of piped drainage underneath a sidewalk. The work shall include: Removal, or saw cuts, of sidewalk slabs, and proper disposal. Installation of new underground piping beneath the adjacent sidewalk that connects via “boot” to downspouts, and directs water to a suitable discharge point, such as a storm sewer or daylight. Restoration of disturbed surfaces, including concrete and landscaping. Underground piping: [e.g., Schedule 40 PVC or SDR-35, minimum 4" diameter, with proper slope and cleanouts if required]. All work must comply with local stormwater and building codes. Contractor is responsible for all permits, inspections, and utility locates.
Red Barn Drainage Improvements (RFB)
zip
City of Indianapolis
Drainage improvements project.
Monroe County
Drainage improvements project.
Jenkins County
Drainage improvements including 50-LF (3) 60 cmp including but not limited to headwalls, wingwalls, rip-rap, grassing, erosion control measures, and miscellaneous construction.
Release
Oct 24, 2025
Close
Nov 03, 2025