Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals for construction services, including labor, equipment, and materials, for the Raintree Stormwater Collection Improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project scope includes, but is not limited to, the installation of 315 linear feet of 30" reinforced concrete pipe; connections to existing curb inlets; installation of a curb inlet and two grate inlets; removal of storm drain; removal and replacement of curb and gutter, sidewalk, asphalt, etc. ; and all other associated work required.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close: Jan 8, 2026
Project scope includes, but is not limited to, the installation of 315 linear feet of 30" reinforced concrete pipe; connections to existing curb inlets; installation of a curb inlet and two grate inlets; removal of storm drain; removal and replacement of curb and gutter, sidewalk, asphalt, etc. ; and all other associated work required.
Premium
Access the largest public sector contact database
Construction of green stormwater infrastructure (GSI) improvements on the Hinesburg Community School Campus.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Close: Dec 18, 2025
Construction of green stormwater infrastructure (GSI) improvements on the Hinesburg Community School Campus.
Removal and installation of stormwater inlet, installation of curb and gutter, placement of aggregate parking lot, lowering of existing manholes, and placement of concrete pavement.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Removal and installation of stormwater inlet, installation of curb and gutter, placement of aggregate parking lot, lowering of existing manholes, and placement of concrete pavement.
AvailableProvide construction of green stormwater infrastructure (GSI) and water distribution system improvements.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
Provide construction of green stormwater infrastructure (GSI) and water distribution system improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis