Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Johnson County Soil Conservation District
Work includes relocation of 105 LF of 4" DR-9 HDPE waterline includes erosion and sediment control, final site grading, and restoration of all disturbed areas.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Johnson County Soil Conservation District
Work includes relocation of approx 280 LF of 6" DR-9 HDPE waterline includes erosion and sediment control, final site grading, and restoration of all disturbed areas.
Posted Date
Nov 12, 2025
Due Date
Nov 27, 2025
Release: Nov 12, 2025
Johnson County Soil Conservation District
Close: Nov 27, 2025
Work includes relocation of approx 280 LF of 6" DR-9 HDPE waterline includes erosion and sediment control, final site grading, and restoration of all disturbed areas.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Mt. Zion Water Supply Corporation
Waterline Relocation Project.
Posted Date
Nov 20, 2025
Due Date
Dec 9, 2025
Release: Nov 20, 2025
Mt. Zion Water Supply Corporation
Close: Dec 9, 2025
Waterline Relocation Project.
AvailableGuadalupe-Blanco River Authority
Roadway expansion, approx. 826 LF of Owner's 24" ductile iron waterline will need to be relocated. The relocations include a proposed 126 LF of 36" steel casing pipe and 20 LF of 36" split steel casing and 80 LF trenchless install.
Posted Date
Oct 28, 2025
Due Date
Dec 2, 2025
Release: Oct 28, 2025
Guadalupe-Blanco River Authority
Close: Dec 2, 2025
Roadway expansion, approx. 826 LF of Owner's 24" ductile iron waterline will need to be relocated. The relocations include a proposed 126 LF of 36" steel casing pipe and 20 LF of 36" split steel casing and 80 LF trenchless install.
AvailableCity of Columbus
The City of Columbus, Mississippi seeks bids for the Waterworks Road / Tuscaloosa Road Over Luxapallia Creek Waterline Replacement Project, involving removal and salvage of existing waterlines, installation of steel casing and ductile iron pipes, gate valve installation, and associated construction work.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
City of Columbus
Close: Dec 15, 2025
The City of Columbus, Mississippi seeks bids for the Waterworks Road / Tuscaloosa Road Over Luxapallia Creek Waterline Replacement Project, involving removal and salvage of existing waterlines, installation of steel casing and ductile iron pipes, gate valve installation, and associated construction work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →