Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Seattle
Project consists of remove above-grade structures, cabinets, hatches, concrete pads, piping, electrical service, water service and other items and appurtenances, remove pump station below grade mechanical and electrical items including all plumbing, piping, valves, fittings, instrumentation equipment, conduit, wiring, devises, supports, and appurtenances. Installation of cipp liner for existing 15" sewer pipe. Furnish and install 8" no-dig ductile iron pipe pss sewer main to line and grade by trenchless guided boring method. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Seattle
Project consists of remove above-grade structures, cabinets, hatches, concrete pads, piping, electrical service, water service and other items and appurtenances, remove pump station below grade mechanical and electrical items including all plumbing, piping, valves, fittings, instrumentation equipment, conduit, wiring, devises, supports, and appurtenances. Installation of cipp liner for existing 15" sewer pipe. Furnish and install 8" no-dig ductile iron pipe pss sewer main to line and grade by trenchless guided boring method. See outside link.
Posted Date
Nov 10, 2025
Due Date
Dec 10, 2025
Release: Nov 10, 2025
City of Seattle
Close: Dec 10, 2025
Project consists of remove above-grade structures, cabinets, hatches, concrete pads, piping, electrical service, water service and other items and appurtenances, remove pump station below grade mechanical and electrical items including all plumbing, piping, valves, fittings, instrumentation equipment, conduit, wiring, devises, supports, and appurtenances. Installation of cipp liner for existing 15" sewer pipe. Furnish and install 8" no-dig ductile iron pipe pss sewer main to line and grade by trenchless guided boring method. See outside link.
AvailableCity of Smyrna
Provide On-Call Trenchless Rehab of Sanitary Sewer/Stormwater Pipe and Infrastructure Services. The selected Contractor(s) will perform trenchless pipe rehabilitation work on an as-needed basis throughout the city.
Posted Date
Oct 22, 2025
Due Date
Nov 21, 2025
Release: Oct 22, 2025
City of Smyrna
Close: Nov 21, 2025
Provide On-Call Trenchless Rehab of Sanitary Sewer/Stormwater Pipe and Infrastructure Services. The selected Contractor(s) will perform trenchless pipe rehabilitation work on an as-needed basis throughout the city.
AvailableCity of Smyrna
Provide on-call trenchless rehab of sanitary sewer/stormwater pipe and infrastructure services.
Posted Date
Oct 22, 2025
Due Date
Nov 21, 2025
Release: Oct 22, 2025
City of Smyrna
Close: Nov 21, 2025
Provide on-call trenchless rehab of sanitary sewer/stormwater pipe and infrastructure services.
AvailableSouth Tahoe Public Utilities District
Work include sewer line spot repair & lateral abandonment services.
Posted Date
Oct 31, 2025
Due Date
Nov 24, 2025
Release: Oct 31, 2025
South Tahoe Public Utilities District
Close: Nov 24, 2025
Work include sewer line spot repair & lateral abandonment services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis