Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Hodgesville Public Service District
Contract #1 proposes to replace portions of existing water mains, and customer services. It also includes site improvements and installing a generator. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Anmoore
Contract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
Posted Date
Oct 16, 2025
Due Date
Nov 18, 2025
Release: Oct 16, 2025
Town of Anmoore
Close: Nov 18, 2025
Contract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
AvailableChristian County Water District
Work include 780 LF 8-inch pvc sdr 21class 200 waterline in place & ready for use, including testing clean up; 698 LF final cleanup of affected water main route; 82 LF uncased driveway bore, all line sizes, in place complete and ready for use; 2 EA 2 gate valve and box, including applicable fittings, in place, complete & ready to use; 2,120 LF 8-inch pvc sdr 21 class 200 waterline, in place & for use, including testing clean up; 100 LF 8-inch yelomine certa-lok pvc class 200 sdr21 waterline, in place & ready for use, including testing clean up; 1980 LF final cleanup of affected water main route (exc. Bores & paved areas).
Posted Date
Oct 31, 2025
Due Date
Nov 25, 2025
Release: Oct 31, 2025
Christian County Water District
Close: Nov 25, 2025
Work include 780 LF 8-inch pvc sdr 21class 200 waterline in place & ready for use, including testing clean up; 698 LF final cleanup of affected water main route; 82 LF uncased driveway bore, all line sizes, in place complete and ready for use; 2 EA 2 gate valve and box, including applicable fittings, in place, complete & ready to use; 2,120 LF 8-inch pvc sdr 21 class 200 waterline, in place & for use, including testing clean up; 100 LF 8-inch yelomine certa-lok pvc class 200 sdr21 waterline, in place & ready for use, including testing clean up; 1980 LF final cleanup of affected water main route (exc. Bores & paved areas).
AvailableVillage of Fort Edward
Water system improvements: replacement of water storage tank & upgrade to booster pump station: Contract 1 – General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work); Contract 2 – Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system.
Posted Date
Oct 29, 2025
Due Date
Dec 4, 2025
Release: Oct 29, 2025
Village of Fort Edward
Close: Dec 4, 2025
Water system improvements: replacement of water storage tank & upgrade to booster pump station: Contract 1 – General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work); Contract 2 – Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system.
AvailableCity of Tescott
Provide water supply system improvements - phase 1. Work includes furnishing all the materials, and equipment for construction of a split faced block building; excavation; backfilling; grading; site and building concrete work; architectural work; masonry block construction; process piping; mechanical and electrical equipment; electrical power upgrades; valves, meters, hydrants, & appurtenances; liquid chlorine equipment; submersible well pumps; well pitless units; water well inspections and improvements at both wells; backup generator; piping; installation of 3" & 4" PVC piping; gravel surfacing; grass seeding; erosion control; well piping and electrical improvements; and all other incidental and appurtenant work required to complete the improvements as shown and specified.
Posted Date
Oct 23, 2025
Due Date
Nov 20, 2025
Release: Oct 23, 2025
City of Tescott
Close: Nov 20, 2025
Provide water supply system improvements - phase 1. Work includes furnishing all the materials, and equipment for construction of a split faced block building; excavation; backfilling; grading; site and building concrete work; architectural work; masonry block construction; process piping; mechanical and electrical equipment; electrical power upgrades; valves, meters, hydrants, & appurtenances; liquid chlorine equipment; submersible well pumps; well pitless units; water well inspections and improvements at both wells; backup generator; piping; installation of 3" & 4" PVC piping; gravel surfacing; grass seeding; erosion control; well piping and electrical improvements; and all other incidental and appurtenant work required to complete the improvements as shown and specified.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis