245-Network Contract Office 5 (36C245)
Work includes but is not limited to demolition and removal of existing structures, architectural, mechanical, with a heavy concentration on plumbing, electrical, landscaping, etc required to completely prepare the site for building the consolidated boiler spaces.
36C24526R0014
245-Network Contract Office 5 (36C245)
Remove the existing boiler in the building 6 mechanical room a weil mcclain water tube boiler rated at 209MBH and replace it with a csd-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided.
245-Network Contract Office 5 (36C245)
Kitchen preventative maintenance.
Network Contract Office 19 (36C259)
Operates four (4) Cleaver Brooks boiler systems which require the assessment and replacement of the gas pressure regulator valves to ensure safe and efficient operations.
Release
Oct 20, 2025
Close
Nov 14, 2025