Retrieving RFP details
Release
Close
245-Network Contract Office 5 (36C245)
Remove the existing boiler in the building 6 mechanical room a weil mcclain water tube boiler rated at 209MBH and replace it with a csd-1 compliant boiler on the existing equipment pad. The old boiler should be properly disposed of after removal with disposal receipts provided.
36C24526Q0071
245-Network Contract Office 5 (36C245)
Work includes but is not limited to demolition and removal of existing structures, architectural, mechanical, with a heavy concentration on plumbing, electrical, landscaping, etc required to completely prepare the site for building the consolidated boiler spaces.
Network Contract Office 19 (36C259)
Operates four (4) Cleaver Brooks boiler systems which require the assessment and replacement of the gas pressure regulator valves to ensure safe and efficient operations.
255-Network Contract Office 15 (36C255)
Inspection, Safety Device Testing and Calibration of the Boiler Plant Burners, Controls, Instruments, and Data Management to be completed at the Veterans Affairs Medical Center (VAMC) BOILER PLANT (BLDG 39).
Release
Oct 17, 2025
Close
Oct 31, 2025