Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Springfield
Work includes 795 LF install 2" plastic gas main and 8" c900 water main, joint trench; 270 LF install 2" plastic gas main and 8" HDPE water main, joint trench; 1,173 LF install 2" plastic gas main; 82 EA install 1/2" plastic gas service, any method; 27 EA install 1/2" gas service street crossing in 11/4" casing; 1 EA tie over 1/2" or 3/4" gas service; 3 EA gas control plan access point; 367 LF install 8" HDPE water main; 29 EA install 1" HDPE water service, single meterset; 3 EA install 1" HDPE water service, dual meterset; 10 EA install 1" hdpe water service street crossing; 4 EA install fire hydrant assembly; 5 EA install water and gas service street crossing via single bore. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Trumbull County
Engineering Services in connection with all projects involving water and sanitary sewer construction and/or treatment for Program Year 2026.
Posted Date
Nov 27, 2025
Due Date
Jan 9, 2026
Release: Nov 27, 2025
Trumbull County
Close: Jan 9, 2026
Engineering Services in connection with all projects involving water and sanitary sewer construction and/or treatment for Program Year 2026.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Colorado Springs Utilities
Natural gas service line replacement program.
Posted Date
Nov 25, 2025
Due Date
Jan 12, 2026
Release: Nov 25, 2025
Colorado Springs Utilities
Close: Jan 12, 2026
Natural gas service line replacement program.
AvailableChester County Solid Waste Authority
Furnish and install 6 (six) standard vertical extraction wells and 3 vertical extraction wells with slip casings. Furnish and install approx. 350 LF of 12" of HDPE gas conveyance piping. Furnish and install approx. 130 LF of 6" HDPE gas conveyance piping. Furnish and install approx. 140 LF of 6" HDPE gas conveyance piping in common trench with 2" of HDPE compressed air piping and 4" of HDPE condensate forcemain piping. Furnish and install approx. 130 LF of 2" HDPE compressed air piping and in common trench with 4" HDPE condensate forcemain piping. Furnish and install all wellheads, fittings, valves and appurtenances. Furnish and install 3 (three) vertical extraction well dewatering pumps and appurtenances. Pull and relocate 2 (two) existing vertical extraction well dewatering pumps, including furnishing new tri-hose tubing. Furnish and install 2 (two) LFG isolation valves. Furnish and install 4 (four) force main air relief valves. Abandonment of existing LFG conveyance piping, compressed air piping, and force main piping below grade. Abandonment of 9 (nine) vertical extraction wells; three having slip casings. Surveying, site preparation, erosion and sediment controls and restoration.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Chester County Solid Waste Authority
Close: Dec 17, 2025
Furnish and install 6 (six) standard vertical extraction wells and 3 vertical extraction wells with slip casings. Furnish and install approx. 350 LF of 12" of HDPE gas conveyance piping. Furnish and install approx. 130 LF of 6" HDPE gas conveyance piping. Furnish and install approx. 140 LF of 6" HDPE gas conveyance piping in common trench with 2" of HDPE compressed air piping and 4" of HDPE condensate forcemain piping. Furnish and install approx. 130 LF of 2" HDPE compressed air piping and in common trench with 4" HDPE condensate forcemain piping. Furnish and install all wellheads, fittings, valves and appurtenances. Furnish and install 3 (three) vertical extraction well dewatering pumps and appurtenances. Pull and relocate 2 (two) existing vertical extraction well dewatering pumps, including furnishing new tri-hose tubing. Furnish and install 2 (two) LFG isolation valves. Furnish and install 4 (four) force main air relief valves. Abandonment of existing LFG conveyance piping, compressed air piping, and force main piping below grade. Abandonment of 9 (nine) vertical extraction wells; three having slip casings. Surveying, site preparation, erosion and sediment controls and restoration.
AvailableCity of Burlington
The City of Burlington seeks a consultant to provide construction inspection and administration for 2026 water distribution system improvements (replacement of ~2,500 ft of water main). Required services include on‑site inspection, daily reporting, construction administration, materials and independent laboratory testing, public outreach and water‑shutoff notifications, payroll/Davis‑Bacon interviews, SRF/DBE/AIS/BABA compliance, and final project certification. Consultant must be able to register to do business in Vermont and carry required insurance.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
City of Burlington
Close: Dec 17, 2025
The City of Burlington seeks a consultant to provide construction inspection and administration for 2026 water distribution system improvements (replacement of ~2,500 ft of water main). Required services include on‑site inspection, daily reporting, construction administration, materials and independent laboratory testing, public outreach and water‑shutoff notifications, payroll/Davis‑Bacon interviews, SRF/DBE/AIS/BABA compliance, and final project certification. Consultant must be able to register to do business in Vermont and carry required insurance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →