Retrieving RFP details
Release
Close
City of Ponca City
remove an old rock retaining wall and construct a new block retaining wall along the south side of the 1400 block road of road in city. The retaining wall spans approx. 225 LF and varies in height from 8.5 feet to 13 feet. The block wall shall be Redi-Rock 28" retaining blocks or approved equal and meet the specifications for ASTM C1776. Project includes staining the block wall to match the natural color of the existing stone wall. Final wall design to be provided by supplier Other items of note in this project include 1,716 cubic yards of unclassified excavation and 1,641 SYs of select borrow. There is also significant tree removal as well as removal and replacement of a portion of the adjacent asphalt street.
Muskingum County
Senior Center Retaining Wall Replacement.
Wisconsin Department of Administration
In general, the work consists of: removing the existing sidewalk and retaining wall, constructing a new concrete retaining wall, replacing the sidewalk, installing a storm inlet and trench drain, and regrading the disturbed area and restoration of disturbed area on the west side of Fricker Hall.
City of Greenwood Village
Replacement of underpass retaining wall capstones.
Release
Oct 30, 2025
Close
Nov 26, 2025