Retrieving RFP details
Release
Close
City of The Colony
The scope of work consists of the reconstruction of Hawse Drive (Arbor Glen Road to Paige Road), Adams Drive (Paige Road to Ramsey Drive), and Pemberton Lane (Blair Oaks Drive to the eastern Cul-de-Sac). Water, sanitary sewer and drainage improvements are provided at various locations of the project. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, approx. 14,031 SY of 6" thick reinforced concrete pavement on flex base subgrade, and approx. 37,589 SF of 4" thick reinforced concrete sidewalks, approx. 380 LF of 21" to 6'X2' reinforced concrete pipe and box, 3,877 LF of 6" to 8" diameter sanitary sewer line, 4,300 LF of 8" water line, and any other work deemed necessary by the City of The Colony.
Clark County
Work includes residential streets pavement reconstruction.
Village of Coldwater
The project includes full depth reconstruction of the street, storm sewers, and some full depth pavement repair and curb replacement.
City of Salt Lake City
Work includes 820 LF of remove fence, remove sign and post, 4 EA of remove water valve and box, 60 LF of saw cut asphalt pavement, 5,500 cy of unclassified excavation, 4 EA of luminaire, type led, 11,550 clearing and grubbing, 575 SY of asphalt pavement tie-in, 6 thick, class ii, 10,350 CY of portland cement concrete pavement, 11 thick, 3,400 LF of pavement markings, 4 yellow, double solid, paint, with black under, 4,700 LF of pavement markings, 6 white, solid line, paint, with black under, retaining wall.
Release
Oct 24, 2025
Close
Nov 13, 2025