Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Plymouth
Provide complete roof replacement services, rooftop solar pv installation, and consideration of battery energy storage system. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Ridgefield
DESIGN/BUILD: Design, finance, install, own, operate, and maintain a roof-mounted solar photovoltaic (PV) system with a maximum capacity of up to 250 kW DC under a Buy-All program structure.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Town of Ridgefield
Close: Dec 16, 2025
DESIGN/BUILD: Design, finance, install, own, operate, and maintain a roof-mounted solar photovoltaic (PV) system with a maximum capacity of up to 250 kW DC under a Buy-All program structure.
AvailableHazlet Township School District
Qualified providers to provide electric to be generated by a solar photovoltaic power system ("PV system") to be installed at Schools. The PV System being considered is a roof mounted system. The base scope for the PV System varies by school as follows: (1) for both of the Middle School and Elementary School, the base and alternate cases permit PV system installations without restrictions on roof sections, as long as the solar remains confined to the rooftop; and (2) for High School, the base case restricts the PV system to select roofing areas, while the alternate case proposes a roof-mounted system with no restrictions, all as more particularly provided in the RFP.
Posted Date
Oct 21, 2025
Due Date
Dec 2, 2025
Release: Oct 21, 2025
Hazlet Township School District
Close: Dec 2, 2025
Qualified providers to provide electric to be generated by a solar photovoltaic power system ("PV system") to be installed at Schools. The PV System being considered is a roof mounted system. The base scope for the PV System varies by school as follows: (1) for both of the Middle School and Elementary School, the base and alternate cases permit PV system installations without restrictions on roof sections, as long as the solar remains confined to the rooftop; and (2) for High School, the base case restricts the PV system to select roofing areas, while the alternate case proposes a roof-mounted system with no restrictions, all as more particularly provided in the RFP.
AvailableRomeo High School
Roof replacement.
Posted Date
Nov 4, 2025
Due Date
Nov 25, 2025
Release: Nov 4, 2025
Romeo High School
Close: Nov 25, 2025
Roof replacement.
AvailableGlades County
Work includes roof repair/replacement.
Posted Date
Oct 29, 2025
Due Date
Nov 19, 2025
Release: Oct 29, 2025
Glades County
Close: Nov 19, 2025
Work includes roof repair/replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis