Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wayne Township (NJ) is soliciting bids to furnish paving materials per specified technical requirements; materials will be made available for pickup at the contractor’s plant. The contract will begin within 21 days of award and has a base term of one year with up to two optional one-year extensions. Bidders must meet New Jersey vendor requirements (Business Registration Certificate, Ownership Disclosure, affirmative action/non-discrimination compliance) and other specifications listed in the bid documents.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide hotmix material per ton for 1100 tons for a city paving project.
Posted Date
Nov 19, 2025
Due Date
Dec 12, 2025
Release: Nov 19, 2025
Close: Dec 12, 2025
Provide hotmix material per ton for 1100 tons for a city paving project.
Premium
Access the largest public sector contact database
The City of Punta Gorda is soliciting an Invitation to Bid for paving and asphalt repair services. The selected contractor will furnish all labor, materials, equipment, traffic control, and incidentals to perform asphalt repairs within city limits on an as-needed basis.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
The City of Punta Gorda is soliciting an Invitation to Bid for paving and asphalt repair services. The selected contractor will furnish all labor, materials, equipment, traffic control, and incidentals to perform asphalt repairs within city limits on an as-needed basis.
AvailableThe City of Punta Gorda is soliciting an Invitation to Bid for paving and asphalt repair services. The selected contractor will furnish all labor, materials, equipment, traffic control, and incidentals to perform asphalt repairs within city limits on an as-needed basis.
Posted Date
Dec 4, 2025
Due Date
Dec 18, 2025
Release: Dec 4, 2025
Close: Dec 18, 2025
The City of Punta Gorda is soliciting an Invitation to Bid for paving and asphalt repair services. The selected contractor will furnish all labor, materials, equipment, traffic control, and incidentals to perform asphalt repairs within city limits on an as-needed basis.
AvailableSeeking qualified asphalt paving companies, acting singularly or in consortium, for road paving projects in the town. All existing pavements will be reclaimed to a minimum depth of eight inches (8") followed by regrading of the roadbed to attain a crown of two and a half percent (2. 5%) or a quarter inch (0. 25") per foot. Prior to beginning reclaiming, excess shoulder materials will be removed where at, or higher than, existing pavements to accommodate grading work and the addition of loam upon completion of paving. Roadbeds will then be watered and compacted to ninety-five percent (95%) compaction, which the town may opt to test prior to paving. All shoulders should then again be cleaned of excess material to allow for placement of four inches (4") of screened loam. See outside link.
Posted Date
Dec 5, 2025
Due Date
Jan 9, 2026
Release: Dec 5, 2025
Close: Jan 9, 2026
Seeking qualified asphalt paving companies, acting singularly or in consortium, for road paving projects in the town. All existing pavements will be reclaimed to a minimum depth of eight inches (8") followed by regrading of the roadbed to attain a crown of two and a half percent (2. 5%) or a quarter inch (0. 25") per foot. Prior to beginning reclaiming, excess shoulder materials will be removed where at, or higher than, existing pavements to accommodate grading work and the addition of loam upon completion of paving. Roadbeds will then be watered and compacted to ninety-five percent (95%) compaction, which the town may opt to test prior to paving. All shoulders should then again be cleaned of excess material to allow for placement of four inches (4") of screened loam. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis