Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Ohio Department of Natural Resources
Paving 2.02 miles on scenic trail - mill existing asphalt, remove and dispose of material; place new asphalt; recondition aggregate shoulders; all adjacent shoulders shall be adjusted to meet and match finish grade of asphalt trail and slope away from the trail in such a way to create a safe and stable shoulder; seal all joints and utility structures, placing grit as necessary, within 24 hours of completion of paving.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Fairlawn
Work include north-south scenic trail.
Posted Date
Jul 28, 2025
Due Date
Nov 25, 2025
Release: Jul 28, 2025
City of Fairlawn
Close: Nov 25, 2025
Work include north-south scenic trail.
AvailableOhio Department of Natural Resources
Contractor must cut and remove existing asphalt to shorten the length of the parking area. It would be thirty feet off the drive lane on both sides. Contractor is to mill at all transitions. Apply ss1h as a bonding agent. Pave with ODOT approved type 1 448 hot asphalt at an average depth of 2.5" approx. SF of new parking lot is 9,080 SF. Compact the material with a vibratory roller at an average depth of 2". Heat thermo seal existing edges to new. Stripe a lot with industrial grade traffic paint.
Posted Date
Sep 25, 2025
Due Date
Dec 3, 2025
Release: Sep 25, 2025
Ohio Department of Natural Resources
Close: Dec 3, 2025
Contractor must cut and remove existing asphalt to shorten the length of the parking area. It would be thirty feet off the drive lane on both sides. Contractor is to mill at all transitions. Apply ss1h as a bonding agent. Pave with ODOT approved type 1 448 hot asphalt at an average depth of 2.5" approx. SF of new parking lot is 9,080 SF. Compact the material with a vibratory roller at an average depth of 2". Heat thermo seal existing edges to new. Stripe a lot with industrial grade traffic paint.
AvailableOhio Department of Natural Resources
Work includes road repair, area is approx. 17' width x 45' length; overlay 1. 5" (+?) of 448 type 1 surface course asphalt; mill entire area at 2" (+?); clean area to overlay; apply. 10 gal. Of tack every square yard; apply leveling course on area; pave 2" of 448 type 1 surface course asphalt over the entire areas; removal of old asphalt.
Posted Date
Oct 9, 2025
Due Date
Dec 3, 2025
Release: Oct 9, 2025
Ohio Department of Natural Resources
Close: Dec 3, 2025
Work includes road repair, area is approx. 17' width x 45' length; overlay 1. 5" (+?) of 448 type 1 surface course asphalt; mill entire area at 2" (+?); clean area to overlay; apply. 10 gal. Of tack every square yard; apply leveling course on area; pave 2" of 448 type 1 surface course asphalt over the entire areas; removal of old asphalt.
AvailableCity of Burbank
Work consists of install and possibly remove banners in three (3) areas of the city.
Posted Date
Aug 26, 2025
Due Date
Nov 21, 2025
Release: Aug 26, 2025
City of Burbank
Close: Nov 21, 2025
Work consists of install and possibly remove banners in three (3) areas of the city.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis