Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
IDOT is soliciting bids for reconstruction of Mattis Avenue in Champaign from Windsor Drive to Curtis Road. The project includes pavement reconstruction, construction of a shared‑use path, and traffic signal modernization, with associated drainage and safety improvements. Bids will be received at the IDOT January 16, 2026 letting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of a full traffic signal with a pedestrian walk signal along with ADA improvements to the intersection. In addition, construct a side path on college avenue along the pelican marsh natural area from the intersection to the existing sidewalk. Work includes: asphalt and concrete removals, earthwork, erosion control, curb, sidewalks, landscaping, traffic signal foundations, installation of traffic signals (traffic signal controller, controller cabinet and poles.
Posted Date
Dec 5, 2025
Due Date
Jan 7, 2026
Release: Dec 5, 2025
Close: Jan 7, 2026
Installation of a full traffic signal with a pedestrian walk signal along with ADA improvements to the intersection. In addition, construct a side path on college avenue along the pelican marsh natural area from the intersection to the existing sidewalk. Work includes: asphalt and concrete removals, earthwork, erosion control, curb, sidewalks, landscaping, traffic signal foundations, installation of traffic signals (traffic signal controller, controller cabinet and poles.
Premium
Access the largest public sector contact database
(2,231-Ft) Intersection Improvements, Traffic Signal Modernization, ADA compliant curb ramps at pedestrian crossings, driveway improvements, pavement markings, landscaping, roadway lighting. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
(2,231-Ft) Intersection Improvements, Traffic Signal Modernization, ADA compliant curb ramps at pedestrian crossings, driveway improvements, pavement markings, landscaping, roadway lighting. See outside link.
AvailableSignal modernization and pedestrian improvements.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
Signal modernization and pedestrian improvements.
AvailableApprox. 3,573 CY Earth excavation; 844 SY topsoil furnish and place, 4"; 983 SY sodding, salt tolerant; 1,520 ft perimeter erosion barrier; 4,361 SY Portland cement concrete base course 9"; 3,187 P bituminous materials (tack coat); 12,284 SF Portland cement concrete sidewalk 5"; 3 EA manholes, type A, 5 LF-diameter, type 1 frame, closed lid; 2 EA fire hydrant with 6" valve and valve box. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Approx. 3,573 CY Earth excavation; 844 SY topsoil furnish and place, 4"; 983 SY sodding, salt tolerant; 1,520 ft perimeter erosion barrier; 4,361 SY Portland cement concrete base course 9"; 3,187 P bituminous materials (tack coat); 12,284 SF Portland cement concrete sidewalk 5"; 3 EA manholes, type A, 5 LF-diameter, type 1 frame, closed lid; 2 EA fire hydrant with 6" valve and valve box. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis