Retrieving RFP details
Release
Close
Sumner County
Provide parking lot project.
City of Cleveland Heights
Repave the city parking lot.
City of Auburn
Replacement of a temporary asphalt grinding parking lot with porous asphalt pavement. Project consists of total reconstruction of a temporary asphalt grinding parking lot at varying widths of 82' to 98', and a length of 144' to 150' for a total of 1,827 SY, with pavement section to be 4" of porous asphalt on 8" of limestone base, including the placement of approx. 115 LF of 8" perforated dual wall pipe, 30 LF of 8" PVC SDR 35. Also including the placement of one 30" catch basin with flat open grate lid and connection into a 24" concrete storm sewer.
Jackson Area Transportation Authority
Project consists of resurfacing and rehabilitation of the administrative building parking lot and driveways. The project will include resurfacing with highway-grade asphalt, repainting of all parking lines, directional arrows, and pavement words, grading for proper water runoff, and drainage repairs. See outside link.
Release
Oct 16, 2025
Close
Nov 06, 2025