This project includes the abandonment and grout filling of approx. 2,460 LF of existing 6", 8" and 12" water main with approx. 1,150 LF of 8" and 12" PVC C-900 pipe. This project also includes the installation of approximately 90 LF of jack and bore crossing. Work shall also include all supervision, equipment, traffic control, granular backfill, pavement restoration (milling included), flushing, disinfecting, testing and all appurtenances necessary to complete the work shown in the Drawings and Specifications.
City of Chino Hills
Work consists Installation of a new 12" PVC C900 DR 14 water main and all associated tasks including trenching; new fire hydrant installation; new water service lateral installation; removal of interfering portions of existing water main infrastructure; backfill and compaction; flushing, disinfection, and testing; asphalt reconstruction; sidewalk and driveway construction; fence and gate replacement; private property restoration; striping restoration; monument preservation.
Borough of Mount Joy
Water main replacement. Including 35 LF of 12" Ductile iron pipe; 1,640 LF of 8" Ductile iron pipe; 760 LF of 6" Ductile iron pipe; 75 LF bore and jack railroad crossing (solid); 30 ea ductile iron fitting; 5 ea fire hydrant assembly; 19 ea water service reconnect; 350 LF type K copper tubing; 100 LF curb and sidewalk restoration; 1,670 SY trench restoration permanent pavement; 3,400 SY mill and overlay permanent pavement; 250 CY miscellaneous rock excavation (contigency item); 75 LF bore and jack railroad crossing (contingency item rock);
City of Algood
Installation of approximately 4,300 LF of 12" ductile iron water main replacing existing main, including graded stone and paving replacement, service line and meter installations as well as all necessary appurtenances to provide a complete water line per the plans and specifications.