Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes site prep to include grubbing etc; construct new 6' asphalt walking trail area to include earthwork, fill, base asphalt etc; repair of existing asphalt walking trail; install 2" overlay on existing asphalt walking trail; repair parking area; re-stripe ada parking.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Drainage Improvements: Work consists of construction of drainage improvements including, but not limited to, HDPE piping, drainage structures and a trapezoidal riprap channel with 8-foot bottom width on a steeply sloped area. The work is located on Block 67, Lot 12 on Hillside Avenue, currently an undeveloped and wooded lot containing public walking trails within the Township.
Posted Date
Dec 10, 2025
Due Date
Jan 8, 2026
Release: Dec 10, 2025
Close: Jan 8, 2026
Drainage Improvements: Work consists of construction of drainage improvements including, but not limited to, HDPE piping, drainage structures and a trapezoidal riprap channel with 8-foot bottom width on a steeply sloped area. The work is located on Block 67, Lot 12 on Hillside Avenue, currently an undeveloped and wooded lot containing public walking trails within the Township.
AvailableRelease: Dec 1, 2025
Close: Dec 30, 2025
Work includes parking improvements.
AvailableProject consists of parking lot improvements. Work includes bid package #1 - asphalt.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Project consists of parking lot improvements. Work includes bid package #1 - asphalt.
AvailableIn general, the proposed work will include demolition of existing improvements as delineated on the plans, grading, street improvements including curb and gutter, paving, sidewalks, curb ramps, driveways, signing and striping and other miscellaneous improvements.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
In general, the proposed work will include demolition of existing improvements as delineated on the plans, grading, street improvements including curb and gutter, paving, sidewalks, curb ramps, driveways, signing and striping and other miscellaneous improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis