Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Orange County Utilities Site Restoration solicitation is an Invitation for Bid for restoration work across various county utility sites, including cold mix overlay, hot mix asphalt, concrete base, lime rock base, and concrete replacement. The contract will be awarded to the low, responsive, and responsible bidder and has an estimated project cost of $35,976,702.50. The contract term is described as 12 months with options to renew for two additional 12-month periods.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes used to restore sites after emergency repairs, routine repairs, and maintenance work. Delivery and installation of soil, sod, flexible pavements, curbs, gutter, other incidentals that were damaged as a result of emergency and routine maintenance and repair activities.
Posted Date
Oct 8, 2025
Due Date
Dec 16, 2025
Release: Oct 8, 2025
Close: Dec 16, 2025
Work includes used to restore sites after emergency repairs, routine repairs, and maintenance work. Delivery and installation of soil, sod, flexible pavements, curbs, gutter, other incidentals that were damaged as a result of emergency and routine maintenance and repair activities.
AvailablePremium
Access the largest public sector contact database
Disconnecting and capping of existing utilities, demolition of main building. Removal of all foundations, fill in foundations, removal of drive-through columns, median and other building related equipment, and clearing and grading of site to drain, and restoration of site by seeding will also be included. The building(s) have been found to include asbestos and a copy of the inspection report is included in the contract documents. Contract includes environmental abatement for each property as necessary.
Posted Date
Dec 5, 2025
Due Date
Jan 6, 2026
Release: Dec 5, 2025
Close: Jan 6, 2026
Disconnecting and capping of existing utilities, demolition of main building. Removal of all foundations, fill in foundations, removal of drive-through columns, median and other building related equipment, and clearing and grading of site to drain, and restoration of site by seeding will also be included. The building(s) have been found to include asbestos and a copy of the inspection report is included in the contract documents. Contract includes environmental abatement for each property as necessary.
Availabledemolition and site restoration of four (4) Vestas V80 wind turbines
Posted Date
Nov 5, 2025
Due Date
Jan 30, 2026
Release: Nov 5, 2025
Close: Jan 30, 2026
demolition and site restoration of four (4) Vestas V80 wind turbines
AvailableRepairs, installation of services, and site restoration, including repairing street damage due to roadway excavation, for the borough water department.
Posted Date
Nov 30, 2025
Due Date
Dec 30, 2025
Release: Nov 30, 2025
Close: Dec 30, 2025
Repairs, installation of services, and site restoration, including repairing street damage due to roadway excavation, for the borough water department.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis