Retrieving RFP details
Release
Close
County of St. Louis
Work includes removal and replacement of deteriorated and/or damaged pavement, removal and replacement of channelization islands pavement surfacing and texturing, superpave asphaltic concrete overlay, removal and replacement of sidewalk and curb ramps, removal and replacement of traffic signal equipment and other incidental items. Also includes 57.5 CY of embankment in place; 795.5 SY of 4" thick type 5 aggregate base; 59.3 TN of type "C" asphaltic concrete, see outside link.
City of Savannah
Road resurfacing.
City of Weston
Work includes milling and resurfacing, installation of new ADA curb ramps; sidewalk replacement; pavement marking; and associated improvements.
Illinois Department of Transportation
Work includes 13 EA. Water service install, 1" complete; 1 EA. Water service install, 2" complete; 1 EA. Pressure connection; 45' storm sewer (water main requirements) 8"; 145' storm sewer (water main requirements) 10"; 325' storm sewer (water main requirements) 12"; 60' storm sewer (water main requirements) 15"; 105' storm sewer (water main requirements) 18"; 1 EA. Manholes, type a, 10'-dia, type 1 frame, closed lid; 4 EA. Plug water main 4"; 10 EA. Plug water main 8"; 200 LF cured-in-place pipe liner, 18".
Release
Oct 13, 2025
Close
Nov 12, 2025