Retrieving RFP details
Release
Close
New York Dormitory Authority
Hostel #7198: Kitchens and bathrooms renovation and associated asbestos abatement. The scope work includes, but is not limited to the following: commercial kitchen interior renovation, including epoxy flooring, stainless steel appliances, electrical outlet relocation as required for proposed layout, quartz countertops with backsplash, solid wood kitchen cabinetry, lighting, and plumbing as required. Replacement of existing 2 compartment sink and drying rack, including a commercial pull down faucet. Replacement of existing residential suppression system with a commercial fire suppression system for a gas range with fire alarm tie in as required. Hostel #8686: Hazardous materials abatement for all walls and ceilings in bathrooms and kitchens. Interior renovation of first and second floor bathroom (2 total), including gypsum wall board, walk-in shower, cabinetry, porcelain tile flooring or epoxy flooring with new subfloor, tile walls, stainless steel ansi/ada grab bars, lighting, bathroom accessories and plumbing piping as required. Design of exhaust fans for each bathroom and kitchen range exhaust system (through-wall). Hostel #9066: Hazardous materials abatement for all walls and ceilings in bathrooms and kitchens. Interior renovation of first and second floor bathroom (2 total), including gypsum wall board, walk-in shower, cabinetry, porcelain tile flooring or epoxy flooring with new subfloor, tile walls, stainless steel ANSI/ADA grab bars, lighting, bathroom accessories and plumbing piping as required. Design of exhaust fans for each bathroom and kitchen range exhaust system (through-wall).
New York Dormitory Authority
CUNY Kingsborough Community College - Bldg G Health and Physical Education Building Pool Renovation and Associated Asbestos Abatement.
New York Dormitory Authority
Psychiatric center building 7 interior renovation & window replacement with associated asbestos abatement. The scope of work for Building 7 will include asbestos abatement, interior demolition, removal and replacement of existing windows and storefront, masonry repairs, interior construction, new interior finishes, finish carpentry, built-in casework, selective plumbing demolition, installation of new plumbing fixtures, domestic water piping distribution, complete bathroom and toilet room updates, fire protection system improvements, HVAC instrumentation and controls, electrical service and distribution, interior lighting, electrical connections to equipment, communication, security as well as fire alarm system improvements.
Chelsea Housing Authority
The Project consists of but not limited to: Valve Replacement Bathrooms, Kitchens, Hallways.
Release
Sep 15, 2025
Close
Nov 18, 2025