Retrieving RFP details
Release
Close
Milwaukee Metropolitan Sewerage District
Remove two existing backdraft dampers from ductwork and disposal of them; furnish and install two new 60" dia., backdraft dampers; conduct functional acceptance test (FAT) of the new backdraft dampers.
Milwaukee Metropolitan Sewerage District
Removal and replacement of the combined dryer exhaust ducting and installation of drains. Removal and replacement of (12) dryer exhaust guillotine dampers (FV-25-19- X) and (1) baghouse isolation guillotine damper (FV-32-33-2) and associated local control panels. Removal and replacement of (12) stack bypass butterfly dampers (FV-25-18-X) (1) baghouse stack bypass butterfly damper (FV-32-33-1) and associated local control panels. Removal and replacement of existing electrical equipment and instrumentation and controls work. Improvements to the drying and dewatering building air plenum.
Veolia Water Milwaukee LLC
Removal and replacement of 2 classification bucket elevators in the dewatering and drying. Removing the existing bucket elevators and designing, furnishing, and installing new bucket elevators and ensuring that they fit the existing bucket elevator configurations and that the bucket elevators. All project administration, mobilization, construction staging, safety and other considerations.
City of Post Falls
Pre-construction and construction services for improvements to the water reclamation facility.
Release
Oct 08, 2025
Close
Nov 06, 2025