Veolia Water Milwaukee LLC
Removal and replacement of 2 classification bucket elevators in the dewatering and drying. Removing the existing bucket elevators and designing, furnishing, and installing new bucket elevators and ensuring that they fit the existing bucket elevator configurations and that the bucket elevators. All project administration, mobilization, construction staging, safety and other considerations.
Milwaukee Metropolitan Sewerage District
Removal and replacement of the combined dryer exhaust ducting and installation of drains. Removal and replacement of (12) dryer exhaust guillotine dampers (FV-25-19- X) and (1) baghouse isolation guillotine damper (FV-32-33-2) and associated local control panels. Removal and replacement of (12) stack bypass butterfly dampers (FV-25-18-X) (1) baghouse stack bypass butterfly damper (FV-32-33-1) and associated local control panels. Removal and replacement of existing electrical equipment and instrumentation and controls work. Improvements to the drying and dewatering building air plenum.
Milwaukee Metropolitan Sewerage District
Remove two existing backdraft dampers from ductwork and disposal of them; furnish and install two new 60" dia., backdraft dampers; conduct functional acceptance test (FAT) of the new backdraft dampers.
City of Post Falls
Pre-construction and construction services for improvements to the water reclamation facility.
St. Johns County
Work includes construction of the proposed reclaimed water pump station, electrical building, related electrical work, motor control centers, variable frequency drives, new vertical turbine pumps and cans, pump station slab and related appurtenances, yard piping, valves, appurtenances as needed, clearing, grubbing, import of structural and common fill for the site and final grading, storm water, landscaping, and fencing improvements.