Retrieving RFP details
Release
Close
Miami University
This project is seeking architectural and engineering services to design a major renovation for the building formerly known as the oxford female institute and later as the oxford college for women. The building is leased long term to the oxford community arts center (ocac).
OCAC Phase 4 Renovation Project *CMAR*
zip
Mannheim School District 83
Phase 2 School renovation. Bid package 2C - demolition, bid package 6A - general trades, bid package 9A - flooring, bid package 9C - painting.
Staunton Community Unit School District 6
Project consists of addition and renovation, phase 2. Work includes bid package no. 14 - general trades, bid package no. 29 - painting. This portion of the project will include casework, doors, resinous flooring, signage, lockers, gym flooring, athletic equipment, telescoping stands, and painting.
City of Kosciusko
The work generally consists of the following: interior finishes including plaster restoration, glass railing assembly, mechanical, electrical, plumbing, and fire sprinkler systems, storefront and masonry work, painting, exterior and sitework with steel stairs, removal and salvaging of wood floor and framing in theater space, ceiling demolition, and removal/demolition of other miscellaneous items.
Release
Aug 18, 2025
Close
Nov 17, 2025