Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 10 LF of 12" galvanized culvert pipe; 130 SF 6" concrete slab; 300 LF trench clean out; 160 LF of culvert pipe clean out. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx 10 LF of 12" galvanized culvert pipe; 130 SF 6" concrete slab; 300 LF trench clean out; 160 LF of culvert pipe clean out. See outside link.
Posted Date
-
Due Date
Dec 16, 2025
Release: -
Close: Dec 16, 2025
Work includes approx 10 LF of 12" galvanized culvert pipe; 130 SF 6" concrete slab; 300 LF trench clean out; 160 LF of culvert pipe clean out. See outside link.
AvailablePremium
Access the largest public sector contact database
The objective of this project is to develop a guide for state DOTs for evaluating when to either replace or rehabilitate culverts and storm drains. The guide will also assist designers in the selection of the most appropriate rehabilitation method(s) along with the applicable loading conditions and design method to use when applying the chosen method.
Posted Date
Nov 4, 2025
Due Date
Jan 6, 2026
Release: Nov 4, 2025
Close: Jan 6, 2026
The objective of this project is to develop a guide for state DOTs for evaluating when to either replace or rehabilitate culverts and storm drains. The guide will also assist designers in the selection of the most appropriate rehabilitation method(s) along with the applicable loading conditions and design method to use when applying the chosen method.
AvailableProject consists of culvert rehabilitation. See outside link.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Close: Dec 18, 2025
Project consists of culvert rehabilitation. See outside link.
AvailableCleaning, inspecting, and preparing culverts for lining, Installing Cured-in-Place pipeliner.
Posted Date
Nov 3, 2025
Due Date
Dec 18, 2025
Release: Nov 3, 2025
Close: Dec 18, 2025
Cleaning, inspecting, and preparing culverts for lining, Installing Cured-in-Place pipeliner.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis