Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction Manager / Contractor at Risk for North Hall Middle School Roof HVAC Renovations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes: HVAC Upgrades at Cunningham Middle School: Controls upgrade, replace 4 AHU's, Replace DX Coil & Condenser, install 13 VFD’s and replace 6 hydronic cooling system pumps. North Shore Middle School roof restoration: install a flute fill ISO, coverboard, and 60mil. felt back PVC roof system with decor ribs to simulate standing seam, new gutters, downspouts, and associated metal, minor repairs to coping cap at low slope roof areas. Cunningham roof restoration: cap new modified bitumen over existing roof membrane and associated metal. Both roofs to extend 20 year NDL warranty.
Posted Date
Dec 7, 2025
Due Date
Jan 12, 2026
Premium
Access the largest public sector contact database
Close: Jan 12, 2026
Work includes: HVAC Upgrades at Cunningham Middle School: Controls upgrade, replace 4 AHU's, Replace DX Coil & Condenser, install 13 VFD’s and replace 6 hydronic cooling system pumps. North Shore Middle School roof restoration: install a flute fill ISO, coverboard, and 60mil. felt back PVC roof system with decor ribs to simulate standing seam, new gutters, downspouts, and associated metal, minor repairs to coping cap at low slope roof areas. Cunningham roof restoration: cap new modified bitumen over existing roof membrane and associated metal. Both roofs to extend 20 year NDL warranty.
AvailableCompetitive sealed proposals for roof replacements/repairs and HVAC upgrades at North Shore Middle School and Cunningham Middle School. Scope includes roof restorations (flute fill ISO, coverboard, 60‑mil felt‑back PVC with decor ribs, gutters/downspouts, modified bitumen cap) with 20‑year NDL warranty and HVAC upgrades at Cunningham (controls upgrade, replace 4 AHUs, replace DX coil & condenser, install 13 VFDs, replace 6 hydronic cooling pumps). A 10% proposal security (bid bond) is required.
Posted Date
Dec 7, 2025
Due Date
Jan 12, 2026
Release: Dec 7, 2025
Close: Jan 12, 2026
Competitive sealed proposals for roof replacements/repairs and HVAC upgrades at North Shore Middle School and Cunningham Middle School. Scope includes roof restorations (flute fill ISO, coverboard, 60‑mil felt‑back PVC with decor ribs, gutters/downspouts, modified bitumen cap) with 20‑year NDL warranty and HVAC upgrades at Cunningham (controls upgrade, replace 4 AHUs, replace DX coil & condenser, install 13 VFDs, replace 6 hydronic cooling pumps). A 10% proposal security (bid bond) is required.
AvailableProvide renovations to city hall. These interior renovations speak to office and common areas to include restrooms. Due to normal wear and tear coupled with growing staff needs, interior space requirements are to be reconfigured to accommodate emerging demands.
Posted Date
Nov 14, 2025
Due Date
Dec 12, 2025
Release: Nov 14, 2025
Close: Dec 12, 2025
Provide renovations to city hall. These interior renovations speak to office and common areas to include restrooms. Due to normal wear and tear coupled with growing staff needs, interior space requirements are to be reconfigured to accommodate emerging demands.
This RFP is for construction services including General Construction, HVAC, Plumbing, and Electrical for gymnasium renovations at Waynesboro Area Middle School.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
This RFP is for construction services including General Construction, HVAC, Plumbing, and Electrical for gymnasium renovations at Waynesboro Area Middle School.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis