Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
National Railroad Passenger Corporation (Amtrak)
Offering up for bid sedia rail passenger car drapes. There are 1,986 each in the lot. Dimensions 40" l x 31" h. Two rod gromets on the top ends with 18 button snaps in between. Each side has velcro fastening system to keep drapes closed. Color is blue.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Huntsville
Solicit sealed proposals for Huntsville MPO Intercity Passenger Rail Study.
Posted Date
Nov 4, 2025
Due Date
Dec 2, 2025
Release: Nov 4, 2025
City of Huntsville
Close: Dec 2, 2025
Solicit sealed proposals for Huntsville MPO Intercity Passenger Rail Study.
AvailableTexas Health and Human Services Commission
Provide infant passenger car seats for grants for the program safe riders.
Posted Date
Nov 7, 2025
Due Date
Dec 1, 2025
Release: Nov 7, 2025
Texas Health and Human Services Commission
Close: Dec 1, 2025
Provide infant passenger car seats for grants for the program safe riders.
AvailableCity of Corpus Christi
Provide liquid chlorine in 90-ton rail car.
Posted Date
Oct 19, 2025
Due Date
Nov 20, 2025
Release: Oct 19, 2025
City of Corpus Christi
Close: Nov 20, 2025
Provide liquid chlorine in 90-ton rail car.
AvailableTown of Bedford
The consultant services contract is for compliance with federal railway administration (fra) requirements, the national environmental policy act (nepa), and the preliminary engineering (pe) design (~30 percent) plans necessary to complete the nepa project development process. The project, as currently programmed, proposes the following improvements: new siding south of the existing norfolk-southern tracks, with no. 20 turnouts at either end, accommodations for signals, and grading to allow the offline construction of the turnout and signals pad and minimize disruption to norfolk-southern service during construction. New 1,000' long by 15β wide high-level boarding platform constructed to amtrak standards. Thirty-space parking lot and a transit drop-off area with separate access for buses and cars. Sidewalk, stairs, and ramps for ada-compliant pedestrian access to the rail-stop platform. Minor improvements along macon street between the proposed rail stop and 4th street. Site grading for the proposed rail-stop, new track, and street improvements, including retaining walls to minimize the impacts to existing buildings and properties.
Posted Date
Oct 23, 2025
Due Date
Nov 25, 2025
Release: Oct 23, 2025
Town of Bedford
Close: Nov 25, 2025
The consultant services contract is for compliance with federal railway administration (fra) requirements, the national environmental policy act (nepa), and the preliminary engineering (pe) design (~30 percent) plans necessary to complete the nepa project development process. The project, as currently programmed, proposes the following improvements: new siding south of the existing norfolk-southern tracks, with no. 20 turnouts at either end, accommodations for signals, and grading to allow the offline construction of the turnout and signals pad and minimize disruption to norfolk-southern service during construction. New 1,000' long by 15β wide high-level boarding platform constructed to amtrak standards. Thirty-space parking lot and a transit drop-off area with separate access for buses and cars. Sidewalk, stairs, and ramps for ada-compliant pedestrian access to the rail-stop platform. Minor improvements along macon street between the proposed rail stop and 4th street. Site grading for the proposed rail-stop, new track, and street improvements, including retaining walls to minimize the impacts to existing buildings and properties.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis