Retrieving RFP details
Release
Close
Utah Department of Agriculture and Food
Work includes construct and install a new floating breakwater section
BD26-39 - pub - BD26-39 New Floating Breakwater for Strawber
zip
Monroe County
Work includes restore and enhance the performance of the existing breakwater within its original footprint, while integrating nature-based solutions to protect the interior shoreline, reduce flood risk, and improve water quality and nearshore habitat conditions.
Borough of Glassboro
Seeks secured pricing for 30-gallon steel drums of floating citrus lift station degreaser.
City of New Bedford
Construction and Installation of a Floating Dock System on the Acushnet River. The scope of work includes, but is not limited to permitting, mobilization, staging, fabrication and installation of floating dock sections, aluminum ramp, anchors, and a precast concrete slab/beam as specified in the bid documents.
Release
Oct 23, 2025
Close
Nov 04, 2025