New York Power Authority
Transportation services from the production area to existing interstate pipeline connections with the facilities system including capacity release on pipelines that deliver.
New York Power Authority
Transportation of natural gas on a firm or interruptible basis, for use - 500 MW power plant. Transportation services from the production area to existing interstate pipeline connections with the facilities system including capacity release on pipelines.
New York Power Authority
Transportation of natural gas on a firm or interruptible basis, for use at the energy II power plant. Transportation Services from the production area to existing interstate pipeline connections with the facilities system including capacity release on pipelines that deliver.
New York Power Authority
Frnish and deliver up to 75,000 barrels of ultra low sulfur distillate (ULSD) oil with a maximum sulfur content of 15 ppm, typically ultra low sulfur diesel (ULSD) or ultra low sulfur heating oil (ULSHO).
Release
Mar 27, 2024
Close
Dec 31, 2025