Retrieving RFP details
Release
Close
Virginia Department of Transportation
Work include 203 LF sign panel; 4,867 LF type b class vi pvmt line mrkg 6"; 4,312 CY regular excavation; 232 LF temporary diversion dike (ec-9); 513 CY siltation control excavation; 8,874 LF rumble strip cylindrical asphalt; 979 SY liquid asphalt coating (rumble strip); 4,331 LF saw-cut asph conc (full depth); 1,134 LF steel piles 12"; 396 CY conc. Cl. A4 mod. Low shrink. , spr. Struct. Const; 1,176 SY bridge deck grooving const.
CABB_QA_12370
Connecticut Office of the Attorney General
Climbing lane extension. Work includes clearing and grubbing; 29,000 CY of earth excavation; 2,900 CY of rock excavation; 76 LF of cut concrete pavement; 9,662 LF of cut bituminous concrete pavement; pavement markings; 39,295 SY of fine milling of bituminous; reset type C catch basin; 6,971 LF of clean existing culvert; 1,020 LF of reset metal beam rail; 22 LF of protective fence. See attached files.
Michigan Department of Technology, Management and Budget
0.28 mi of hot mix asphalt cold milling and resurfacing, widening for center left turn lane, concrete curb and gutter, sidewalk, signal work, guardrail improvements and pavement markings.
City of Olive Branch
The project consists of the construction of Craft Road Widening from College Road to Church Road in the City of Olive Branch MS.
Release
-
Close
Nov 19, 2025