Retrieving RFP details
Release
Close
City of Idaho Falls
This project shall consist of the contractor furnishing all tools, labor, equipment, and materials necessary to install concrete sidewalk, asphalt driveways, infiltration swales and adjust water meter boxes, and any additional items.
Vernon Hills Park District
Work includes removal of existing asphalt, concrete, or dirt and the installation of new concrete and detectable warning surface (truncated domes) where necessary.
City of Columbus
The work consist of approx 14,570 SY remove paving including sawing; 5,400 LF 4" perforated underdrain piping system; 12,229 SY 9" PC concrete doweled paving; 312 SF ADA handicap ramp detectable warning panel; 57 LF 18" RCP class III storm sewer; 18 EA adjust manhole to grade; 4,860 LF 4" final paint striping yellow solid and dashed.
City of Kearney
Reconfiguration of the intersection of Avenue to include a southbound left-turn lane and new traffic signal. Removing existing pavement and mid-block crossing and placing 1,500 SY of 8" concrete pavement and 4,700 SF of concrete sidewalk. This project also consists of storm sewer improvements, traffic signal installation and associated electrical work, pavement striping and all other associated work.
Release
Nov 03, 2025
Close
Nov 18, 2025