Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
University of Michigan Ann Arbor
Condensate system replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
South Jersey Transportation Authority, Purchasing Dept.
Work consists of replace the tunnel's carbon monoxide monitoring system and filters. Filters for replacement are located in the tunnel along the ceiling panels while the co monitoring system equipment and plc is located in the electrical substation building located atop the tunnel on horace j. Bryant jr. Drive in atlantic city. Maintenance and protection of traffic will be required for filter replacement work performed in the tunnel.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
South Jersey Transportation Authority, Purchasing Dept.
Close: Dec 17, 2025
Work consists of replace the tunnel's carbon monoxide monitoring system and filters. Filters for replacement are located in the tunnel along the ceiling panels while the co monitoring system equipment and plc is located in the electrical substation building located atop the tunnel on horace j. Bryant jr. Drive in atlantic city. Maintenance and protection of traffic will be required for filter replacement work performed in the tunnel.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Wisconsin Department of Administration
In general, the work consists of: Replace five existing low pressure steam condensate pumps and receivers with new duplex condensate pumps at four campus buildings: Applied Arts, Fryland Hall, Jarvis Hall - Science Wing, and Louis Smith Tainter House. Provide new electrical and housekeeping pads as required.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
Wisconsin Department of Administration
Close: Dec 18, 2025
In general, the work consists of: Replace five existing low pressure steam condensate pumps and receivers with new duplex condensate pumps at four campus buildings: Applied Arts, Fryland Hall, Jarvis Hall - Science Wing, and Louis Smith Tainter House. Provide new electrical and housekeeping pads as required.
AvailableSioux Falls School District 49-5
Work includes tunnel piping and chiller replacement.
Posted Date
-
Due Date
Dec 16, 2025
Sioux Falls School District 49-5
Close: Dec 16, 2025
Work includes tunnel piping and chiller replacement.
AvailableArkansas Department of Transportation
Replacement of continuously reinforced concrete pavement sections along Interstate 40.
Posted Date
-
Due Date
Dec 9, 2025
Arkansas Department of Transportation
Close: Dec 9, 2025
Replacement of continuously reinforced concrete pavement sections along Interstate 40.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →