Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
690567 Western Federal Lands Division
Provide bridge resurfacing and rehabilitation. The project consists of replacement of existing timber decking with metal grid bridge deck, replacement of existing timber railing with metal bridge rail, performing scour remediation and concrete repair, and grading and resurfacing of the roadway adjacent to the bridge, project length is 0.348 mile. The project includes replacing the existing timber decking with metal grid bridge deck (approx. 1,080’ long x 15’ wide), replacing the existing timber railing with metal bridge rail (approx. 2,170’ long), and performing scour remediation and concrete repair. The work includes demolition of the existing timber bridge deck and existing timber railing.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
690567 Western Federal Lands Division
Provide bridge resurfacing and rehabilitation. The project consists of replacement of existing timber decking with metal grid bridge deck, replacement of existing timber railing with metal bridge rail, performing scour remediation and concrete repair, and grading and resurfacing of the roadway adjacent to the bridge, project length is 0.348 mile. The project includes replacing the existing timber decking with metal grid bridge deck (approx. 1,080’ long x 15’ wide), replacing the existing timber railing with metal bridge rail (approx. 2,170’ long), and performing scour remediation and concrete repair. The work includes demolition of the existing timber bridge deck and existing timber railing.
Posted Date
Oct 22, 2025
Due Date
Nov 21, 2025
Release: Oct 22, 2025
690567 Western Federal Lands Division
Close: Nov 21, 2025
Provide bridge resurfacing and rehabilitation. The project consists of replacement of existing timber decking with metal grid bridge deck, replacement of existing timber railing with metal bridge rail, performing scour remediation and concrete repair, and grading and resurfacing of the roadway adjacent to the bridge, project length is 0.348 mile. The project includes replacing the existing timber decking with metal grid bridge deck (approx. 1,080’ long x 15’ wide), replacing the existing timber railing with metal bridge rail (approx. 2,170’ long), and performing scour remediation and concrete repair. The work includes demolition of the existing timber bridge deck and existing timber railing.
AvailableAllegany County
Bridge rehabilitation.
Posted Date
Nov 12, 2025
Due Date
Dec 11, 2025
Release: Nov 12, 2025
Allegany County
Close: Dec 11, 2025
Bridge rehabilitation.
AvailableMichigan Department of Technology, Management and Budget
Bridge rehabilitation including penetrating healer sealer, clean and seal joints, deck fascia patching, expansion joint replacement, concrete beam repairs, silane treatment, concrete surface coating and pavement markings on M-294 over Kalamazoo River.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
Michigan Department of Technology, Management and Budget
Close: Dec 5, 2025
Bridge rehabilitation including penetrating healer sealer, clean and seal joints, deck fascia patching, expansion joint replacement, concrete beam repairs, silane treatment, concrete surface coating and pavement markings on M-294 over Kalamazoo River.
AvailableColorado Department of Transportation
Roadway resurfacing along with bridge and guard rail improvements.
Posted Date
-
Due Date
Dec 4, 2025
Colorado Department of Transportation
Close: Dec 4, 2025
Roadway resurfacing along with bridge and guard rail improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis