Retrieving RFP details
Release
Close
Millard Public Schools
Work includes 3,570 SF construct 5" thick PC concrete; 1,140 LF construct bottom rail on existing chain link gate; 365 SF construct segmental retaining wall; 1,840 LF construct 12" x 1" flat drain lateral with fabric; 920 LF construct 12" perforated collector pipe with fittings and gravel fill pipe bedding; 1 EA. construct 15" storm sewer tap; 1 EA. construct 8" storm sewer tap; 5,050 SY subgrade preparation; 720 LF construct 12" x 10" reinforced PC concrete curb; 205 LF construct 8" storm sewer with pipe bedding.
Millard Public Schools
High school baseball and softball field improvements.
Millard Public Schools
Work includes 1,500 LF construct 12" perforated collector pipe with fittings and gravel fill pipe bedding; 3,900 LF construct 12" perforated collector pipe with fittings and gravel fill pipe bedding; 1,895 LF construct 15" storm sewer with pipe bedding; 1,110 LF construct 12" x 10" reinforced PC concrete curb; 370 LF construct 12" x 8" reinforced PC concrete curb; 290 LF construct 72" chain link fence with salvaged yellow corrugated PVC top cap; 1,050 construct bottom rail on existing fence; 2,870 SF construct 5" thick PC concrete.
City of Pearland
Baseball and softball field lighting system upgrade.
Release
Oct 27, 2025
Close
Nov 13, 2025