Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Loomis
The Town of Loomis seeks bids to repair and improve the Montserrat Equestrian Trail, including ripping and grading the surface, establishing positive drainage, and installing decomposed granite paving and related accessories. The project is estimated at $100,000–$200,000 with a 20 working day duration and $500/day liquidated damages.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Los Angeles
The City of Los Angeles Bureau of Engineering seeks a consultant to develop an Equestrian Trail Connection Plan for the Northeast San Fernando Valley. This Task Order Solicitation is limited to firms on the BOE Pre‑Qualified On‑Call Architectural and Other Professional Services Consultants List (Tier 2).
Posted Date
-
Due Date
Jan 9, 2026
City of Los Angeles
Close: Jan 9, 2026
The City of Los Angeles Bureau of Engineering seeks a consultant to develop an Equestrian Trail Connection Plan for the Northeast San Fernando Valley. This Task Order Solicitation is limited to firms on the BOE Pre‑Qualified On‑Call Architectural and Other Professional Services Consultants List (Tier 2).
AvailableDelmarva Central Railroad Company
Gl trail crossings project.
Posted Date
Nov 9, 2025
Due Date
Dec 9, 2025
Release: Nov 9, 2025
Delmarva Central Railroad Company
Close: Dec 9, 2025
Gl trail crossings project.
AvailableTown of Altavista
Work generally includes: clearing of approx. 4,750 LF of trail path, excavation of trail path to a width of ten feet and depth of 12", installation of approx. 70 tons of gravel, and installation of three 20' drainage/culvert pipes within the project area; as well as reseeding of all disturbed areas.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Town of Altavista
Close: Jan 7, 2026
Work generally includes: clearing of approx. 4,750 LF of trail path, excavation of trail path to a width of ten feet and depth of 12", installation of approx. 70 tons of gravel, and installation of three 20' drainage/culvert pipes within the project area; as well as reseeding of all disturbed areas.
AvailableWayne County
Trail Phase 4A Project.
Posted Date
Oct 31, 2025
Due Date
Nov 21, 2025
Release: Oct 31, 2025
Wayne County
Close: Nov 21, 2025
Trail Phase 4A Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis