Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
South Central Connecticut Regional Water Authority
Work include replacement of the existing tank mixing systems at six drinking water storage tanks including mixer, the mixer control center, electrical junction boxes, conduit, wire, associated electrical work, and in-service sediment removal and disposal from the interior of each water storage tank using remote operated vehicle prior to placing the new mixing system in service.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
South Central Connecticut Regional Water Authority
Work consists of mixing improvements at various water storage tanks.
Posted Date
Nov 5, 2025
Due Date
Dec 5, 2025
Release: Nov 5, 2025
South Central Connecticut Regional Water Authority
Close: Dec 5, 2025
Work consists of mixing improvements at various water storage tanks.
AvailableSequoyah County Rural Water Sewer Gas And Solid Waste Mgt Dist 7
1100 road water storage tanks consisting of a new 240,000 gallon standpipe water storage tank and rehabilitation of an existing 220,000 gallon standpipe water storage and all appurtenances.
Posted Date
Nov 11, 2025
Due Date
Dec 16, 2025
Release: Nov 11, 2025
Sequoyah County Rural Water Sewer Gas And Solid Waste Mgt Dist 7
Close: Dec 16, 2025
1100 road water storage tanks consisting of a new 240,000 gallon standpipe water storage tank and rehabilitation of an existing 220,000 gallon standpipe water storage and all appurtenances.
AvailableCity of Wauseon
Work includes installation of a mixer and spray system inside the existing elevated water tower, includes electrical work for the purposed equipment, control panels and electric utility feed.
Posted Date
-
Due Date
Dec 11, 2025
City of Wauseon
Close: Dec 11, 2025
Work includes installation of a mixer and spray system inside the existing elevated water tower, includes electrical work for the purposed equipment, control panels and electric utility feed.
AvailableVillage of Fort Edward
Water system improvements: replacement of water storage tank & upgrade to booster pump station: Contract 1 – General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work); Contract 2 – Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system.
Posted Date
Oct 29, 2025
Due Date
Dec 4, 2025
Release: Oct 29, 2025
Village of Fort Edward
Close: Dec 4, 2025
Water system improvements: replacement of water storage tank & upgrade to booster pump station: Contract 1 – General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work); Contract 2 – Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis