Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Gulfport
Work shall consist essentially of the following items: base repairs, milling, hot mix asphalt overlay, casting adjustment, shoulder repair.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Gulfport
The City of Gulfport seeks bids for pavement removal, base repairs, limestone, asphalt, concrete curb and gutter, and driveway replacement under the MIMA Paving Phase II Part 1 Project. Bids are to be submitted on a unit price basis, with award to the lowest and best bid. Compliance with City and MDOT standards is required.
Posted Date
-
Due Date
Dec 8, 2025
City of Gulfport
Close: Dec 8, 2025
The City of Gulfport seeks bids for pavement removal, base repairs, limestone, asphalt, concrete curb and gutter, and driveway replacement under the MIMA Paving Phase II Part 1 Project. Bids are to be submitted on a unit price basis, with award to the lowest and best bid. Compliance with City and MDOT standards is required.
AvailableCity of Jacksonville Beach
Installation of 2,373 LF of 8" PVC (DR-18) watermain by open cut with 53 LF of 6" PVC (DR-18) watermain and 33 LF of 12" PVC (DR-18) watermain by open cut for cross-street connections, 431 LF of 8" FPVC (DR-11) watermain by horizontal directional boring, 1,821 LF of 16" PVC (DR-14) forcemain by open cut, 645 LF of 16" HDPE (DR-11) forcemain by horizontal directional boring, 1099 LF of 15" PVC stormwater pipe, 1,051 LF of 18" PVC stormwater pipe, 753 LF of 24" PVC stormwater pipe, replacing seven (7) sanitary sewer manholes, and rehabilitation of various sizes of gravity main by Cured-In-Place Pipe (CIPP) and open cut methods including demolition of portions of the existing sidewalk and driveways as well as the demolition of the existing pavement and construction of sidewalks, driveways, and paving, and all necessary appurtenances complete, in place.
Posted Date
Nov 6, 2025
Due Date
Dec 10, 2025
Release: Nov 6, 2025
City of Jacksonville Beach
Close: Dec 10, 2025
Installation of 2,373 LF of 8" PVC (DR-18) watermain by open cut with 53 LF of 6" PVC (DR-18) watermain and 33 LF of 12" PVC (DR-18) watermain by open cut for cross-street connections, 431 LF of 8" FPVC (DR-11) watermain by horizontal directional boring, 1,821 LF of 16" PVC (DR-14) forcemain by open cut, 645 LF of 16" HDPE (DR-11) forcemain by horizontal directional boring, 1099 LF of 15" PVC stormwater pipe, 1,051 LF of 18" PVC stormwater pipe, 753 LF of 24" PVC stormwater pipe, replacing seven (7) sanitary sewer manholes, and rehabilitation of various sizes of gravity main by Cured-In-Place Pipe (CIPP) and open cut methods including demolition of portions of the existing sidewalk and driveways as well as the demolition of the existing pavement and construction of sidewalks, driveways, and paving, and all necessary appurtenances complete, in place.
AvailableMontgomery County Emergency Services District 3
Construction of Water, Sanitary, Drainage, and Paving Facilities.
Posted Date
Nov 14, 2025
Due Date
Dec 4, 2025
Release: Nov 14, 2025
Montgomery County Emergency Services District 3
Close: Dec 4, 2025
Construction of Water, Sanitary, Drainage, and Paving Facilities.
AvailablePaso Robles Joint Unified School District
Work consists of school modernization.
Posted Date
Aug 13, 2025
Due Date
Dec 1, 2025
Release: Aug 13, 2025
Paso Robles Joint Unified School District
Close: Dec 1, 2025
Work consists of school modernization.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis