Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Palm Coast
Provide concrete driveway replacement, concrete flatwork, asphalt restoration, and sod installation services on an as-needed basis. Work may include driveways, sidewalks, valley gutters, curb and gutter, asphalt pavement restoration, sod installation, and miscellaneous concrete flatwork such as equipment pads for backflows, generators, and bypass pumps throughout the City. Fine grade and compact topsoil ensuring proper drainage. Restore landscaping, irrigation, pavement markings, and signage affected by work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
American Municipal Power (AMP)
demolition and site restoration of four (4) Vestas V80 wind turbines
Posted Date
Nov 5, 2025
Due Date
Jan 30, 2026
Release: Nov 5, 2025
American Municipal Power (AMP)
Close: Jan 30, 2026
demolition and site restoration of four (4) Vestas V80 wind turbines
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
County of Maui
Furnishing of asphalt concrete, emulsified asphalt.
Posted Date
Nov 26, 2025
Due Date
Dec 15, 2025
Release: Nov 26, 2025
County of Maui
Close: Dec 15, 2025
Furnishing of asphalt concrete, emulsified asphalt.
AvailableTownship of Long Beach
Asphalt and concrete recycling. Including tipping fees for concrete; tipping fees for asphalt; tipping fees for mixed asphalt & concrete.
Posted Date
Nov 26, 2025
Due Date
Dec 11, 2025
Release: Nov 26, 2025
Township of Long Beach
Close: Dec 11, 2025
Asphalt and concrete recycling. Including tipping fees for concrete; tipping fees for asphalt; tipping fees for mixed asphalt & concrete.
AvailableCity of Stillwater
Water utilities concrete and asphalt restorations. Work includes on-call pavement restoration and repair at locations where city utility or water line work has been performed. Removal and replacement of asphalt and concrete pavement, curb and gutter, sidewalks, and driveways as needed. Subgrade preparation, installation of aggregate base and geogrid, and adjustments to existing inlets, manholes, and valve boxes, as needed.
Posted Date
Nov 1, 2025
Due Date
Dec 3, 2025
Release: Nov 1, 2025
City of Stillwater
Close: Dec 3, 2025
Water utilities concrete and asphalt restorations. Work includes on-call pavement restoration and repair at locations where city utility or water line work has been performed. Removal and replacement of asphalt and concrete pavement, curb and gutter, sidewalks, and driveways as needed. Subgrade preparation, installation of aggregate base and geogrid, and adjustments to existing inlets, manholes, and valve boxes, as needed.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →