Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed work consists of all labor, materials and equipment necessary for the replacement of a portion of the roofing, roofing restoration, flashing repairs and related general building work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Rockdale County Board of Education seeks bids for re-roofing select sections of Edwards Middle School, involving removal of old roof and installation of a new roof system on an occupied building. Coordination required due to ongoing school operations. Bidders must submit a Pre-Qualification Statement and attend a mandatory pre-bid conference.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Rockdale County Board of Education seeks bids for re-roofing select sections of Edwards Middle School, involving removal of old roof and installation of a new roof system on an occupied building. Coordination required due to ongoing school operations. Bidders must submit a Pre-Qualification Statement and attend a mandatory pre-bid conference.
Premium
Access the largest public sector contact database
The scope of the project consists of re-roofing select roof sections of an existing school system facility, an area of approximately 32,500+/- SF. Work includes, but is not limited to, removal of old roof and installation of a new roof system on an occupied building.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
The scope of the project consists of re-roofing select roof sections of an existing school system facility, an area of approximately 32,500+/- SF. Work includes, but is not limited to, removal of old roof and installation of a new roof system on an occupied building.
AvailableRe-roofing select roof sections of an existing school system facility, an area of approximately 32,500+/- SF. Work includes, but is not limited to, removal of old roof and installation of a new roof system on an occupied building.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
Re-roofing select roof sections of an existing school system facility, an area of approximately 32,500+/- SF. Work includes, but is not limited to, removal of old roof and installation of a new roof system on an occupied building.
AvailableReplacement and repairs of school roof and associated metal work.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Release: Nov 18, 2025
Close: Dec 17, 2025
Replacement and repairs of school roof and associated metal work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis